Laserfiche WebLink
<br /> <br />~'.-'l <br />!I . <br /> <br />fi~';; ,- <br />~:~:::';~~~~ ' <br />11,:,;:" ' <br />1i'",,".4,' . <br />~,\::,':~r,j:~ <br /> <br />POMrplant. <br /> <br />r BOlin. Weter Veer 1883 <br />)tal energy delivery to the Hoover <br />.es during the 1983 operating year (June <br />12 - May 31, 1983) was 3,648,598,541 <br />.tt-hours (kWh). There wes no <br />dary or disputed energy dallvered to the <br />er allotlees during the operating year. <br /> <br />'emote control operation of Davia and. <br />Ir Powerplants which first began durIng <br />year 1982 continued without event. <br />. generator units are computer operated <br />the Department of Energy's Phoenix <br />Itch Otflce, using hourly gate opening <br />legawalt .cheduleslnput and modified <br />clamatlon's Water Scheduling Branch In <br />ler City, Nevada. <br /> <br />lCessary maintenance at Hoover, Parker, <br />lavls Powerplants was performed In <br />year 1983. The maintenance schedule <br />oils Dam during water year 1983 was <br />d up because of anticipated high water <br />les during water year 1984. Davis Unit 5 <br />hut down during the spring of 1983 so <br />i1e draft tube and penstock gates could <br />:ondltloned at that time. This action, <br />with adverse weather conditions <br />Intered during the reconditioning at the <br />on Davis Unit 3, forced rescheduling of <br />enance on the other units (see chart). <br /> <br />r year 1983 was the first time since Davis <br />Nas built that Its spillway gate had to be <br />It wasalso the first tlmeslnce1841 that <br /> <br />'I <br />1--: <br /> <br />the Hoover Dam spillways have been used. <br />There was no known damage at Davis Dam. <br />and only minor damage was done to the <br />Hoover Nevada spillway tunnel during the <br />high releases at 1883. <br /> <br />Each of the four Parker Powerplant units In <br />turn were out of service for short periods of <br />time during February or March 1883 for <br />governor ballhead and 011 motor vibrator <br />InstallatIon. These modifications were <br />modernization Improvements to the <br />governors. <br /> <br />Combined flows otup to 40,000 cfs through <br />the Parker Dam spillway and generator units <br />during water year 1983 caused considerable <br />damage to an access road Immediately <br />downstream from the powerplant. The dam <br />and powerplant themselves were unaffected. <br />All generators at Parker Powerplant have <br />experienced sustained use beginning May 5, <br />1983. <br /> <br />Weter Veer 1984 <br /> <br />In operation studies of Lake Mead and Lake <br />Powell for the Hoover operatIng year, which <br />ends May 31,1984, the amounts released at <br />Hoover Dam have been projected to satisfy <br />both downstream water requirements, <br />Including diversion by the Dlltrlct, while alIa <br />complying with the overell requlrement8to <br />meet compact, flood control and operating <br /> <br />I <br />I <br />, <br />'J <br />1 <br />, ."-;.,! <br />i <br />i <br />1 <br /> <br /> <br />-l <br />I <br />.. : <br /> <br />., <br /> <br />" <br />j -~ .! <br />~\,':;~ <br />'j r,\,J <br />-, .~ ~ <br />"if ~41-' <br />.',"",~\l <br />.,.., 1,,;1 <br />....~.'.,:;;I..., <br />\ .1 <br />. , <br />:..".., . <br /> <br />, <br />f> <br />~' <br /> <br />Siphon Drop generator nsl.r Y~ma;.Arlzona. <br /> <br />criteria release provisions. The water <br />scheduled to be released will generate 100 <br />percent of contract defined firm energy, plus <br />secondary energy. The estimated monthly <br />Hoover releases during the operating year <br />total 19.55 million acre-teet. It Is estimated <br />that generation from these Hoover releases, <br />along with the Hoover to Parker-Davis <br />Interchange, will result In delivery to the <br />allottees of about 8.34 billion kWh of electrical <br />energy. <br /> <br />Major maintenance at Davis and Parker <br />Powerplants has not been scheduled for water <br />year 1984 because of projected high water <br />releases. Major maintenance Is scheduled at <br />Hoover Powerplant, but at a reduced level. <br /> <br />Paradox gate overhauls at Hoover Dam will <br />require short(one or two day) penstock <br />outages at the upper Nevada penstock and <br />both Arizona penstocks during January, <br />February, April andlorJuna 1984. <br /> <br />The tollowlng charts Illustrate Lower Basin <br />generator unit outage schedules for water <br />year 1983 and projections for water year 1984. <br /> <br />31 <br />