My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11772
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11772
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:49 PM
Creation date
10/12/2006 5:09:52 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.600.10.B
Description
John Martin Reservoir - Operation Studies
State
CO
Basin
Arkansas
Water Division
2
Date
10/16/1974
Author
CWCB
Title
Proposed Catlin Transfer Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />::::> <br /> <br />-:-) 7. <br /> <br />N <br />_0_ _ _ <br />c) <br />CJI <br /> <br />=c <br /> <br />The recommended operation plan is based on leaving the state's <br />shares in the Catlin Canal. Delivery of state water would be <br />-made at~itate. gatesonthecanal- at either Timpas Creek o-r-- <br />Crooked Arroyo. The ditch rider would set the state gates <br />according to the proper number of shares, the same as for any <br />other shareholder, and therefore would not injure other Catlin <br />shareholders. When the Catlin is diverting water at rates <br />equal to or less than 248 cfs, the state will take credit water <br />at a gate to be constructed on Crooked Arroyo; when the Catlin <br />is diverting at rates greater than 248 cfs, the state will take <br />credit water at a gate to be constructed on Timpas Creek. <br />winter credit water will be ieft in the Arkansas River. The <br />plan is shown in table 3 for the historic conditions of compact <br />years 1949-73. Total credits during anyone year cannot exceed <br />the maximum from table 2, which is 5,455 acre-feet, and the <br />average total credit equals the average from table 2, which is <br />4,533 acre-feet. <br /> <br />A. Estimated state credit water delivered to Crooked <br />Arroyo is shown in column 4 of table 3. The number <br />of shares attached to the gate was reduced from <br />2,097.58 to 1,914.26 to compensate for return flow <br />that was historically available to Ft. Lyon Canal <br />at Timpas Creek. Credit at this gate averaged <br />3,383 acre-feet. <br /> <br />B. Estimated state credit water delivered to Timpas <br />Creek is shown in column 6 of table 3. The amounts <br />are 68.556 percent of the diversion at the state <br />gate and were reduced so that the totals did not <br />exceed 5,455 acre-feet. They averaged 1,150 acre- <br />feet during the 25-year period. <br /> <br />C. Total irrigation season credits are shown in <br />column 7 of table 3 and average 4,533 acre-feet. <br /> <br />8. CHECKS <br /> <br />A. Average irrigation season credit equals average <br />consumptive use. <br /> <br />B. Maximum irrigation season credit equals maximum <br />consumptive use. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.