My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11761
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11761
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:46 PM
Creation date
10/12/2006 5:09:21 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441.400
Description
Colorado Big Thompson Project - Reports
State
CO
Basin
South Platte
Water Division
1
Date
4/1/1987
Title
Joint-Use Reservoir and Green Mountain Exchange Projects - Summary Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />';'\ <br />1.1.. <br />9, <br /> <br />'........] <br />.. <br /> <br />r) <br />,J <br /> <br />fl <br />,>A <br /> <br />(,-~ <br />iiJ <br /> <br />.1 <br />U <br /> <br />~"'" <br />tJ <br /> <br />::~:t <br />;~;' .' <br />i,,'J <br /> <br />"'I <br /> <br />fJ <br /> <br />~>} <br />'( '5 <br />',:< <br />~:j <br /> <br />F~} <br />,',1 <br /> <br />",:':1 <br />",'.. <br /> <br />LJ <br /> <br />fi <br />t.:~.; <br /> <br />:~: '~ <br />;:,:-,~ <br />"J <br /> <br />1'::] <br />',- ~ <br />:i.~j <br /> <br />o <br />o <br />,) <br />m <br />~ <br />C,.Il <br /> <br />OPTIONAL HYDROPOWER PLANTS <br /> <br />Potential hydropower installations have been evaluated at Red Mountain Dam, Azure Dam and <br /> <br />Una Dam. A hydropower retrofit with smaller turbines has been evaluated at Green Mountain Power <br /> <br />Plant. Hydropower plants have been considered as optional features. Investment costs and <br /> <br />potential hydropower benefits have not been included in Exchange Project costs. No market study <br /> <br />has been conducted, however, based on filed purchase payment rates of the Public Service <br /> <br /> <br />Company of Colorado, the Azure plant would earn an 8 percent return over its estimated annu,alized <br /> <br />investment and operation cost of $0.036 per kWh. The financial potential of other plants in Table S.3 <br /> <br />can be judged relative to Azure; Red MOl,lntain and Green Mountain plants would be less attractive <br /> <br /> <br />and the Una plant more attractive. <br /> <br />TABLE S.3 <br /> <br />PROJECTED HYDROPOWER GENERATION <br />AND ESTIMATED PRODUCTION COST <br /> <br />SITES <br /> <br /> ANNUAL PRODUCTION <br />CAPACITY GENERATION COST <br />kW GWh 1$/kWh) <br />1300 3.4 0.111 <br />7000 36,2 0.036 <br />17,600 88.5 0.019 <br />3000 6.2 0.057 <br /> <br />Red Mountain <br /> <br />Azure <br /> <br />Una <br /> <br />Green Mountain <br /> <br />Note: Units shown are kilowatt (kW) and gigawatt hour (GWh). (1 GWh = 1,000,000 kWh). <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.