Laserfiche WebLink
<br />OJ2~:H <br /> <br />Animas-La Plata Project <br />Feature Fact Sheet <br /> <br />Phase 1, Stage A <br /> <br />Reservoirs and Dams <br /> <br />Ridges Basin Dam <br />Height above streambed (feet) <br />Crest Length (feet) <br /> <br />Ridges Basin Reservoir <br />Capacity <br />Active Capacity (acre-feet) <br />Inactive and Dead Capacity (acre-feet) <br />Total Capacity (acre-feet) <br /> <br />Surface Area (at top of active - elev. 6,694) (in acres) <br /> <br />Pumping Plants <br /> <br />Maximum <br />lift (feel) <br /> <br />Durango Pumping Plant <br />Ridges Basin Pumping Planl <br /> <br />525 <br />900 <br /> <br />Pipelines <br /> <br />Length <br />.!miIW <br /> <br />Diameter <br />(inches) <br /> <br />Ridges Basin Inlet Conduit <br />Durango M&I Pipeline <br />Shenandoah M&I Pipeline <br />La Plata Rural M&I Pipeline I <br /> <br />2.4 <br />3.2 <br />7.8 <br />4.7 <br /> <br />120 <br />18 <br />18t06 <br />14 <br /> <br />Recreation Facilities <br /> <br />Ridges Basin Reservoir Recreation Area <br />People at one time <br />Annual recreation days <br />Facilities: Hiking trails, camping units, picnic units, boat ramp and slips, <br />parking area, entrance station, beach, fish cleaning station, and <br />administrative building, <br /> <br />I Would be constructed if llfib( Phase I, Stage A were constructed, <br /> <br />313 <br />1,900 <br /> <br />127,900 <br />145200 <br />273,100 <br /> <br />2,240 <br /> <br />Capacity <br />.....(ill} <br /> <br />70 <br />10 <br /> <br />Capacity <br />....iill) <br /> <br />480 <br />II <br />5.6 to 0.28 <br />4 <br /> <br />3,000 <br />290,000 <br />