My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11736
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:42 PM
Creation date
10/12/2006 5:08:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.44.A.1
Description
Green Mountain Reservoir
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1999
Author
USDOI/BOR
Title
1999 Late Summer and Fall Operations Report of the HUP Managing Entities and Water Managers
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />that point, it was uncertain whether any of the 66,000 acre-feet would be surplus and available <br />for release to the Grand Valley Power Plant and the 15 Mile Reach. <br /> <br />A total of 9 meetings and/or conference calls were held from July 14 to November 3 to manage <br />reservoir releases, coordinate irrigation diversions in the Grand Valley, and attempt to maintain <br />the mean monthly target flows in the 15 Mile Reach. <br /> <br />During the 1999 irrigation season, releases that directly or indirectly benefitted flows in the <br />15 Mile Reach were made from the following reservoirs: <br /> <br />1) Ruedi Reservoir <br />2) Wolford Mountain Reservoir <br />3) Green Mountain Reservoir Historic User's Pool <br />4) Dillon Reservoir <br />5) Williams Fork Reservoir <br />6) Granby Reservoir <br />7) Willow Creek Reservoir <br /> <br />Beginning in September, representatives from Denver Water (managers of Dillon and Williams <br />Fork Reservoirs) and the Northern Colorado Water Conservancy District (managers of Gran by <br />and Willow Creek Reservoirs) participated in conference calls to coordinate planned releases <br />from their reservoirs. <br /> <br />In October, the Public Service Company of Colorado's Shoshone Power Plant staff participated <br />in conference calls to request lowered Colorado River flows during their maintenance scheduled <br />to begin in November. <br /> <br />Flow Recommendations <br /> <br />At the July 14 meeting, the Service set the mean monthly target flow for the IS-Mile Reach at <br />1,240 cfs, based on an 80% exceedance, or drier than average, year. By the second week of <br />August, hydrologic conditions in the basin had improved, and the Service revised the target to <br />1,630 cfs, the flow recommended for an above average water year. <br /> <br />The Service has calculated recommendations for mean minimum flows and the percent of years <br />(the rate) the flows should be provided. The rate was determined using historical variations in <br />winter snowpack levels (high, above-average, below-average and low). The Service's mean <br />monthly flow recommendations for the 15 Mile Reach during the late summer months (from <br />page 65 of their 1995 report) are: <br /> <br />Snowoack Level <br />High <br />Above Average <br />Below Average <br />Low <br /> <br />Rate <br />25% <br />25% <br />30% <br />20% <br /> <br />Aug/Seo/Oct Mean Monthlv Flow <br />1,630 cfs <br />1,630 cfs <br />1,240 cfs <br />810 cfs <br /> <br />1999 Late SummerlFall Operations <br /> <br />HUP Managing Entities & Water Managers <br /> <br />- 2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.