My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11735
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11735
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:41 PM
Creation date
10/12/2006 5:08:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.111.E
Description
Central Utah Participating Project
State
UT
Basin
Colorado Mainstem
Date
10/1/1987
Author
USDOI-BOR
Title
Supplement to Definite Plan Report Central Utah Project Bonneville Unit
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Number <br />39 <br />40 <br /> <br />41 <br />42 <br /> <br />43 <br /> <br />44 <br /> <br />45 <br /> <br />46 <br /> <br />47 <br /> <br />TABLES (Continued) <br /> <br />Cultural resource inventory . . . . . . . . . . . . . . <br />Population for 1950, 1960, 1970, and 1980, and popu- <br />lation projections for 1990 and 2000, with annual <br />average rate of change for the Bonneville Unit by <br /> <br />P~~: <br /> <br />. <br /> <br />166 <br />168 <br /> <br />county. . . . . . . . . . . . . . . . . . . . . . <br />Lands for project features. . . . . . . . . . . . . <br />Construction phase income and employment impacts-- <br />Municipal and Industrial System . . . . . . . . . <br />Construction phase direct empoyment, immigration, <br />and household support impacts--Municipal and <br />Industrial System. . . . . . . . . . . . . . . <br />Construction phase income and employment impacts-- <br />Diamond Fork Power System . . . . . . . . . . . . <br />Construction phase direct employment, immigration, <br />and household support impacts--Diamond Fork <br />Power System. . . . . . . . . . . . . . . . . . . . <br />Construction phase income and employment impacts-- <br />Irrigation and Drainage System. . . . . . . . . . . <br />Construction phase direct employment, immigration, <br />and household support impacts--Irrigation and <br />Drainage System . . . . . . . . . . . . . . . . . <br /> <br />. . <br /> <br />169 <br /> <br />. . <br /> <br />171 <br /> <br />172 <br /> <br />173 <br /> <br />175 <br /> <br />176 <br /> <br />. . <br /> <br />MAPS, CHARTS, AND FIGURES <br /> <br />Bonneville Unit Map No. 66-400-1185. . . . . . . . . . . . .Frontispiece <br />Schematic profile <br /> <br />Figure <br />number <br />1 Central Utah Project General Map 1251-400-1015. . . 4 <br />2 Bonneville Unit map . . . . . . . . . . . . . . . . . . 7 <br />3 Uinta Basin portion of the Bonneville Unit. . . . . 20 <br />4 Bonneville Basin Portion Map. . . . . . . . . . . . . 28 <br />5 M&1 System Map. . . . . . . . . . . . . . . . . . . . . 30 <br />6 Jordan and Alpine Aqueducts location map. . . . . . . 32 <br />7 Diamond Fork Power System map . . . . . . . . . . . . . 36 <br />8 1&D System recommended plan . . . . . . . . . . . . 40 <br />9 Uinta Basin Water distribution chart. . . . . . . . 103 <br />10 Bonneville Basin water distribution chart . . . . . . 105 <br /> <br />vii <br />
The URL can be used to link to this page
Your browser does not support the video tag.