My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11730
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11730
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:40 PM
Creation date
10/12/2006 5:08:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.766
Description
Gunnison River General
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/3000
Author
Unknown
Title
Gunnison River Basin Planning Model - Miscellaneous Data
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />'! <br /> <br />C)"e"./nn <br />~, J ~.:. i:( , <br />., _ '-' _ v <br /> <br />Uncomoahare Proiect and Tavlor should be separate listings to <br />simplify for Tavlor--note use, etc. <br /> <br />Uncomoahare proiect--see attached list of decrees. Rights in <br />the M & D Canal are most critical for administration since direct <br />flow rights in downstream cnals are small and are generally met by <br />return flow. <br /> <br />The 245.32 cfs (cumulative total) at Holt #125l6.0 is the <br />critical right. Since this right is for 100 cfs, it is the <br />operative priority much of the time the Uncompahgre is on call. <br />Above the 245. 32 cfs total in the ditch, we generally have had <br />sufficient water to get by (with a full tunnel and South Canal). <br />The river rarely drops below 145.32 cfs. Calling with senior <br />rights produces little water. <br /> <br />The att~ched list proyid~s info on UVWUA water rights on the <br />Uncompahgre. ' <br /> <br />Dallas Creek Proiect--83,000 total capacity, 25,000 dead <br />storage <br /> <br />Decreed use irrigatio~ domestic, municipal, industrial and <br />flood control <br /> <br />Historic operation--evacuation in late sumer and fall to <br />create flood pool, bypass through winter with slight raise in <br />water level to prevent ice damage to docks. <br /> <br />Begin fill April 1 ?? (check date with Art Cannon) Fill rate <br />based on forecast. <br /> <br />Check w/Bureau o~ Art Cannon for flood control rules for <br />filling reservoir. <br />
The URL can be used to link to this page
Your browser does not support the video tag.