My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11729
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11729
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:40 PM
Creation date
10/12/2006 5:08:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.116.A
Description
Fruitland Mesa Project
State
CO
Basin
Gunnison
Water Division
4
Date
7/30/1976
Author
USDOI - BOR
Title
Bureau of Reclamation Report to Colorado Water Conservation Board - (Fruitland Mesa portion only)
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />July 1976 <br /> <br />, STlMMARY SHEETS <br /> <br />Fruitland Mesa Project <br /> <br />LOCATION <br /> <br />The Fruitland Mesa Project is located in west central Colorado in the <br />Gunnison River Basin of the Upper Colorado River Basin. <br /> <br />PURPOSE <br /> <br />The project would develop unused water supplies from Soap, Curecanti, <br />and Grystal Creeks, for irrigation of supplemental and full service <br />land between the Black Canyon of the Gunnison National Monument and <br />the town of Crawford. Benefits would also be provided for recreation, <br />fish, and wildlife. <br /> <br />STATUS <br /> <br />The Fruitland Mesa Project was authorized for construction September <br />2, 1964, (Public Law 88-568) as a participating project under the <br />Colorado River Storage Project Act of April 11, 1956 (Public Law 84- <br />485). A definite plan report was completed in June 1967. Because <br />of changes in plan, costs, and benefits the definite plan report is <br />being revised and is scheduledofor completion, <br /> <br />A repayment contract with ,the Fruitland Mesa Water Conservancy District <br />was signed in 1969. An archaeological survey of the project was com- <br />pleted in'August 1975. Expressions of interests are being received <br />from A & E contractors for selection of a firm to prepare designs for the <br />Soap Park Access Road. <br /> <br />The FY 1976 Public Works Appropriation Act included $957,000 for FY 1976 <br />and $150,000 for the transition quarter to begin construction of the <br />project. The President's : budget for FY 19/7 includes $3,000,000 to continue <br />construction. 0 <br /> <br />PIAN <br /> <br />Project water would be obtained from Soap, Curecanti, and Crystal Creeks. <br />Regulation of project water supplies ~ould be provided at the potential <br />Milly K. Goodwin Lake on Soap Creek and at the existing Gould Reservoir <br />On Iron Creek. <br />
The URL can be used to link to this page
Your browser does not support the video tag.