Laserfiche WebLink
<br />:j <br />;'$ <br /> <br />.--'"''"1.,. <br /> <br />. ,','. -'~~', ac;'j;'_~.~i.., <br /> <br /> <br />'.AJ <br />C0 <br />c.;J <br />(~ ..' <br />( ") <br /> <br />'-- <br /> <br />STREAMFLOW <br /> <br />Galisteo Creek below Galisteo Dam, N. Mex. <br /> <br />Location.-Water-stage recorder, Iat 35'27'56", long 106'12'57", in SEI/45EI/4 sec. 5, T. 14 N., R 7 E., 0.6 mile downstream from <br />Galisteo Dam, and 55 miles northwest of Cerrlllos. Altitude of gage Is 5,450 ft. <br />Draina~ area.-597 sq mf. <br />Averaee discharge._21 years (1971-91), 6.25 It'/s (4,530 acre-ft per year). <br />Extremes.-1970_91: Maximum discharge, 2,000 It'/s July 27, 1971 (gage height, 7.00 It); maximum gage height, 7.33 It July 20,1971; no <br />flow many days each year. <br />Remarks.-ReCOrds poor. Flow partly regulated by uncontrolled outlettn Galisleo Dam. Capacity of outlet, 5,000 It'/s when reservoIr <br />is full. Diversions for irrigation of about SO acres above reservoir. <br /> <br />Monthly and yearly discharge, In cubic feet per second <br /> <br />41 <br /> <br /> Second- Maximum Minimum Runoff In <br />Month foot-days daily daily Mean acr~feet <br />January 28.00 1.5 .00 .90 56 <br />February 19.13 .80 .50 .68 38 <br />Maoch 22.90 1.9 .41 .74 45 <br />April 130 .63 .00 .043 2.6 <br />May 11.45 8.7 .00 .37 23 <br />June 14831 94 .00 4.94 294 <br />July J,029.61 330 .00 33.2 2,040 <br />August J,727.66 513 .23 55.7 3,430 <br />September 397.14 226 .18 13.2 788 <br />October 11.01 2.1 .00 .36 22 <br />November 19.92 13 .00 .66 40 <br />December 19.65 .90 .40 .63 39 <br />Calendar year 1991 3,436.08 513 .00 9.41 6,820 <br /> Jemez River below Jemez Canyon Dam, N. Me>:. <br /> <br />Locatlon.-Water_slage recorder, lat 35'23'24", long 106'32'03", In NEI/4 sec. 5, T. n N., R. 4 E., 0.8 mile downstream from Jemez <br />Canyon Dam, 2.0 miles upstream from mouth, and 6 miles north of Bernalillo. Datum of gage Is 5,095.60 ft above mean sea leveL <br />datum of 1929. Prior to April 24, 1951, at site three-quarters of a mile upSIneam at datum 24.51 It higher. April 24, 1951 to June 25, 1958, <br />at site 37 ft uPSIneam at datum 4.40 ft higher. <br />Draina2e area.-1,038 sq mJ. <br />AveraSe dlscharge.-49 years (1937,1944-91),61.9 It'/s (44,850 acre-ft per year). <br />Extremes.-1937,1944-91: Maximum discharge, 16,300 It'/s Aug. 29, 1943 (gage height, 5.62 It); no flow at times. <br />Remarks.-Records good. Flow regulated by Jemez Canyon Dam since October 1953. Diversions for irrigation of about 3,000 acres <br />above station. <br /> <br /> Monthly and yearly discharge, In cubic feet per second <br /> Second- Maximum Minimum Runoff In <br />Month foot-days daily daily Mean acre-feet <br />muary 922.8 135 2.1 29.8 1)l3O <br />ebruary 808 43 20 28.9 1,600 <br />(arch 1,925 88 48 62.1 3,820 <br />pril 5,191.8 306 2.1 173 10,300 <br />'ay 78.27 4.2 .28 252 155 <br />ne 9.75 .38 .28 32 19 <br />Iy 2,876.32 624 .22 92.8 5,710 <br />'gust 7.649.16 1,320 .28 247 15,170 <br />plember 3,881.27 870 .78 129 7,700 <br />tober 4675 53 1.1 15.1 927 <br />Ivember 2,043 292 16 68.1 4,050 <br />c:ember 2,088 160 24 67.4 4;140 <br />endar year 1991 27,940.87 1,320 .22 76.6 55,420 <br /> <br />