My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11697
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:33 PM
Creation date
10/12/2006 5:06:47 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147
Description
Arkansas River Basin - Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
4/5/1949
Author
DOI-BOR
Title
Gunnison-Arkansas Project - Report of the Regional Director
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />vv v <br /> <br />DD's')'O <br /> <br />water supply of the Eastern Slope area 15 by diver,ion of' water fran <br /> <br />the Cola-lldo kiver tlaa1n. It must be er:,pbalized Ullt t~ addititJnal <br /> <br /> <br />water su.pply rore oontemplated 15 to be used for.. supplemental supply <br /> <br /> <br />and not to create.. lar&o XWtW additional irrigated a~reage. <br /> <br />Power <br /> <br />Tho hydroeleotrio pcwer- resouroe8 of the EaatorD Slope are rela- <br /> <br />tlvely undeveloped ... only 9.420 kilowatts of ~d.roe1ectr1c pnerating <br /> <br />oapacity are installed at present repreaent~ ODq a small part of <br /> <br />the potential aval111ble. Powor o~iIl6d frOlll l\Ydroeleotrlc plants oon- <br /> <br />.-titute" only about 11 percent of' the electricity gener..ted. on the <br /> <br />Eastern Slope. Electric power requ1rco.ents are greater than the quontlty <br /> <br />generated 10. the projeot 8.rea. enl the deficit la being supplied rrom <br /> <br />plantS out,ide the area. Additional power 1_ needed for pro&ent local <br /> <br />conaw.:ptlon. Industrial expe.oslon is d.ependent upon the availability <br /> <br />of large blocks of firm po_r at re",sonable rates. lirom.. conaerVlltion <br /> <br />.taodpo1.J:rt, the h;ydroelectric ecerg that oould potent1a.lly bet gener&ted <br /> <br />by the Initial De"t'elopDI".t 1n tha Arkan.... \alley .hould be conawmrated <br /> <br />in order that the diminishing reserve. of" gas, oil, aDd ooal_ neM' uBod <br /> <br />for 89 percent of all electric p01lll8r generation in tho area may be oon- <br /> <br />served &Dd converted locally 1tr. 1tr.orea.ed quantit101 to more strategic <br /> <br />usee.About 1,500,000 barrels of '1\1el oil alom could be oonserved annualy <br />throuch utlliut ion of ~roeleotric energy e;enecollted by the potential project. <br />The principal p0WW3r market area that would be 8.rvud by the Inlt1al <br /> <br />Denlopment is the State of Colorado east or the CoIItinental Divide. t~s <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.