My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11670
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11670
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:28 PM
Creation date
10/12/2006 5:06:08 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
11/1/1983
Title
Monthly Progress Report - Aquatrain Project - November 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..-! <br />'1' <br />""", <br />rl <br /> <br />. <br /> <br />. <br /> <br />c' <br />'> .-' <br /> <br />Meetings held between AQUATRAIN/BlM staff and the U.S. Forest <br />Service to review Manti/lasal National Forest section of <br />the Corridor Study. As a result of the meetings, each prospective <br />route will be reanalyzed as a one-mile corridor rather than <br />the original ten mile corridor. Several new routes through <br />the area were added. The schedule for completion of the <br />Corridor Study will be slipped to mid-February 1984 to accommodate <br />this additional work. <br /> <br />C) <br /> <br />Attended public hearings for White Pine Powerplant Environmental <br />Impact Statement in Las Vegas, Elko, and Ely, Nevada. <br /> <br />Preliminary Report awaiting review of cost figures and technical <br />details by Arthur D. little & Co. Completion estimated <br />by mid-January 1984, assuming early review by Arthur D. <br />little. <br /> <br />Statement of Work prepared for Fish and Wildlife Service <br />participation in AQUATRAIN EIS. <br /> <br />Western Area Power Administration continues to work on our <br />request to evaluate potential for sale of excess power from <br />fluidized-bed combustion chambers. <br /> <br />6.2 ANTICIPATED DECEMBER EVENTS <br /> <br />Come to agreement with Forest Service on Memorandum of Understanding <br />and submit to Reclamation Solicitor for review. <br /> <br />Complete Work Order #2 to BlM/Reclamation Interagency Agreement <br />and submit to UC-1SO and UC-700 for review. Work Order #2 <br />will define the scope of work and funding level for preparation <br />of Project EIS. <br /> <br />Continue work on Preliminary Report. <br /> <br />Western Area Power Administraticn to complete study and <br />submit report on potential for sale of excess power from <br />fluidized-bed combustion chamber. <br /> <br />Complete Corridor Study rewrites on corridors between Green <br />River and lynndle, Utah. <br /> <br />6.3 ANTICIPATED JANUARY EVENTS <br /> <br />Complete Preliminary Report, assuming early review by Arthur D. <br />Litt le, Inc. <br /> <br />Sign Forest Service Memorandum of Understanding. <br /> <br />Begin work on Project description for Enviromental Impact <br />Satement. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.