My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11669
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11669
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:27 PM
Creation date
10/12/2006 5:06:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limestone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
9/1/1996
Author
Bent Soil Conservati
Title
Limestone-Graveyard Creeks Watershed Bent County Colorado Prowers County Colorado Watershed Plan and Environmental Assessment
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />059!3 <br /> <br />LIST OF PREPARERS <br /> <br />This Draft Watershed Plan/EA was prepared by an interdisciplinary team <br />composed of the following specialists, for NRCS as well as other <br />specialists. <br /> <br />Name <br />Job Title <br />Assignment <br />Education <br />Experience <br /> <br />Name <br />Job Title <br />Assignment <br />Education <br /> <br />Experience <br /> <br />Name <br />Job Title <br />Assignment <br />Education <br />Experience <br /> <br />Name <br />Job Title <br />Assignment <br /> <br />Education <br />Experience <br /> <br />Name <br />Job Title <br />Assignment <br /> <br />Education <br />Experience <br /> <br />Jim P. Thornton (Now Retired) <br />Water Resources Planning Staff Leader <br />Coordinated Staff Activities <br />BS, Agricultural Engineering, 1960 <br />NRCS engineer - 15 years <br />Water Resources Planning Staff Leader - 16 years <br />P.E. Colorado and New Mexico <br /> <br />P. Stanley Mitchem <br />State Geologist, Wyoming <br />Principal investigator for geology <br />BS, Geology, Oregon State, 1971 <br />Wyoming PG Registration <br />oregon RPG Registration <br />Hydrogeology, Wright State University, 1985 <br />NRCS State Geologist - 9.2 years <br />Planning Staff Geologist - 11.5 years <br />Cartographic Tech - 1.2 years <br /> <br />Harry L. Smith <br />Planning Engineer/Cultural Resource Specialist <br />principal investigator for engineering designs <br />BS, Agricultural Engineering, 1965 <br />NRCS Engineer - 30 years <br /> <br />Nyle L. Jordre <br />Economist <br />Principal investigator for economic evaluations and <br />coordinated plan development and write-up. <br />BS,MS, Agricultural Economics, 1967 NDSU <br />NRCS Economist - 28 years <br />NRCS Soil Conservationist - 1 year <br /> <br />Tim Sweeney <br />Resource Conservationist/Water Quality Specialist <br />Helped formulate alternatives, developed effects and <br />developed public participants plan. <br />BS, Natural Resource Management, 1974 <br />NRCS Soil Conservationist - 13 years <br />NRCS District Conservationist - 3 years <br />Forestry Tech. (U.S. Army) - 3 years <br /> <br />61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.