Laserfiche WebLink
<br />VIII. Project Status: <br /> <br />A. Land-based tracking stations will continue to collect and log <br />movement data for radiotagged Colorado pikeminnow using the lower <br />Gunnison River during the fall of 1998 and winter and spring of <br />1999. <br /> <br />B. Project is ongoing and is .on-track". <br /> <br />IX. FY 98 Budget <br /> <br />A. Funds Provided: $ 115,000 <br />B. Funds Expended: $ 95.000 <br />C. Difference: $ 20,000 <br />D. Status of Work--Percent of Work Completed (if BR.funded project): <br />$ 20K was carried over into FY99 to cover radio tags and tracking <br />costs associated with Colorado pikeminnow passing through the <br />fish ladder at Redlands. These funds will be spent in early. <br />FY99. <br />E. Publication Costs: $ 0 <br /> <br />X. Status of Data Submission: <br /> <br />The four Colorado pikeminnow collected in the 2.3-mile reach of the <br />lower Gunnison River were implanted with radiotags in FY98. All four <br />of these pikeminnow in addition to the 23 Colorado pikeminnow <br />captured in the fish trap of the fish passageway at Redlands <br />Diversion Dam were checked for a PIT.tag. Fish previously not <br />captured were PIT-tagged and the following data collected from all <br />fish prior to their being released: total length (mm) , weight (g). <br />reproductive condition, and date and location of capture. These data <br />have been computerized. The total number of fishes that were <br />collected in the fish trap at Redlands fish passageway has also been <br />computerized. <br /> <br />XI. Signed: Bob D. BurdicK <br />Principal Investigator <br /> <br />98/11/30 <br />Date <br /> <br />APPENDIX: <br /> <br />I <br /> <br />A. More comprehensive/final project reports. If distributed <br />previously, simply reference the document or report. None <br /> <br />CAP-4B-7 <br />