My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11629
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11629
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:13 PM
Creation date
10/12/2006 5:05:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8112.600
Description
Arkansas White Red Basins Interagency Committee - AWRBIAC -- Reports
Basin
Arkansas
Water Division
2
Date
1/16/1952
Title
Application Procedures for Economic Evaluation of Projects - Second Progress Report of the Work Group on Benefits and Costs - AWRBIAC
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~~~~;. :>: <br />.."". -~' <br /> <br />rit'r, <br />;;'.',,' <br /> <br />praotioable after the adoption of this report. <br /> <br />These price projeotions <br /> <br />for speoifio oommodities and groups of oommodities are shown in tables 1, <br /> <br />2, and 3, attaohed as appendix I of this report. <br /> <br />2. In evaluating projeots and programs, 'or portions thereof, ex- <br /> <br />peoted to be oonstruoted or installed within five years after the seleo- <br /> <br />tion of the final plan, prioes ourrent at that time will be used for <br /> <br />oonstruotion or ,installation oosts only. For these projects or programs <br /> <br />the reoommended long-term projected prices will be used in evaluating <br /> <br />all other oosts (operation, maintenanoe" major replaoements', and Bimilar <br /> <br />items) and all benefits, except benefits expressed in terms of the cost <br /> <br />of a justifiable alternative source.. In these instanoes, the prioes for <br /> <br />the alternative costs, will be 'the prioes' expeoted to prevail at the time <br /> <br />the alternative oosts would'be: inourred; 'The alternative costs may be <br /> <br />assumed to ocour at the same time as the retated project oosts are <br /> <br />expeoted to ooour. <br /> <br />3. It is expeoted that long-term projeoted prices for items in <br /> <br />addition to those contained in tables 2 and 3 (appendix I) and for <br /> <br /> <br />states in the Arkansas-White-Red Basins will 'be oomputed. These pro- <br /> <br /> <br />jeotions will be furnished to field offices as soon as they are made <br /> <br />available to Arkansas-White-Red Basms' Inter-Agenoy Committee. <br /> <br />4. Looal, Sta.te" or National "agricultural price data for individ- <br /> <br />ual products and oost. items should be obtained from the State statis- <br /> <br />tioian, the s~ate agrioultural college, or from the Bureau of Agricul- <br /> <br />tural Eoonomics, United StateB Department of Agriculture. Local prices <br /> <br />should be used wherever available. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.