My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11628
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11628
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:13 PM
Creation date
10/12/2006 5:05:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.J
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
1/1/1938
Author
USDOI/BOR
Title
Boulder Canyon Project Final Reports: Part VI/ Bulletin 1 - Model Studies of Spillways
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.~ <br />~ <br />Ifj <br /><:': <br /> <br />c <br /> <br />CONTENTS (Continued) <br /> <br />SIDE CHANNEL SPILLWAY WITH DRUM GATES (M-I AND M-2) <br /> <br />SECTION PAGE <br />23. Design and construction of 1 :20 modeL..............hmhm___......................___.. 54 <br />24. Results from original design.__....u.......__.__u.u...u..__....................__n............... 58 <br />25. Increased slope in channel fioor............................m.m...__._____.. mm"m'__n___ 64 <br />26. Coping on rear wall of channeL.m.mmmn...nmn...................hh................... 65 <br />27. Flat-top contraction in transition.....................____ mnnm___n .....__..__m...__.. 66 <br />28. Improved portal shape.................................................................................... 68 <br />29. Vanes in inclined tunnel.........mhm.___ummn.m..............n.....___n....mn..n........ 68 <br />30. Cylindrically faced baffles.............................................................................. 70 <br /> <br />31. Sills on channel floor._............h...h........n.n.n.u......m..uu............h.............,..,. 73 <br />32. Deflector vanes on spillway.............................._.._....._.._n_........_..................... 73 <br />33. Troughs in floor of channel........................................................................... 74 <br /> <br />CHAPTER III-MODELS OF SEMI"FINAL DESIGN <br />OF SPILLWAYS <br /> <br />MODEL WITH DRUM GATES, 1:60 SCALE (C-4) <br />34. Design and construction of modeL.......................h.mn........_...mm....h....... 77 <br />35. Results from original designmn_...uu..._._n....._n_..._........_.._.__.......__.u.._.......... 79 <br />36. Channel extension of 60. feeL.mmmm_..__n..........mm...._.m........._...nun....m. 79 <br />37. Cross-weir at end of channeL_m________....__......__.......m....m___mm..m.m..m.m. 81 <br />38. Offset in channel waIL_.......m....._mn....____ .........._.......................______..___........ 81 <br />39. Improvement of transition sbape__.___._.._..u._._n.._............._..._......_.u.......___u.. 82 <br />4(}. Curved wall at upstream end..._._.........nm..._.mmu....._._n.................._....._.._. 84 <br />41. Installation of Baffles...................................................................................... 90 <br />42. False floor across channeL...._..._______u._.............._.............._._........_....._....m..n 92 <br />43. Trough in front half of cbanneI.................................................................... 92 <br />44. Deflectors on crest side..._...._.._...................._.........._ .._m...._...__._..._.._..._..._...... 97 <br />45. False wall in channeL...m__..._._..._.__......_............_n...._.m_n...._..........._...u.m... 9'7 <br /> <br />MODEL WITH DRUM GATES, 1:20 SCALE (M-3) <br />46. Design and construction of modeL.........m........mm_m___mnm.___u.._.._.._...... 97 <br />47. Results from original design....mm___....m___._umn..._.......mmmhmum_mmm.. 99 <br />48. Curved wall at upstream end....._m__...................._....._._................m......._._... 100 <br />49. Installation of dentated batfles..._..__......__._......_.....m......n...m._.._._...__._.._._.... 10.0. <br />50. Flow conditions, drum gates raised........___n.....................n..m___nm_m____.n 102 <br />51. Direction of currents._...........m......_........._.........m....m._........................._..._.... 10.4 <br />52. Air content of water...........mu....m.......____.._..___........m._..._......__._._...m........... 104 <br />53. Measurement of air content......m..._.m__..u_........................................_......._...104 <br />54. Results of air measurements.........._...._.__.......m...._.._._n._.._...._.._..._......_......... 105 <br />55. Accuracy of methods........................................................................................ 108 <br />56. Model and prototype results......_.._...._._.__......u_.._.u...uuu_......_.....__...........____ 109 <br />57. Conclusions on air contenL........_.._.m..........._._......m._._._m...._....................... 10.9 <br /> <br />DRUM-GATE MODEL, 1:100 SCALE (M-4) <br /> <br />58. Description and results.._......n. m_.___._ <br />2 <br /> <br />110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.