Laserfiche WebLink
<br />, ~ <br /> <br />. <br /> <br />''. <br /> <br />... <br />..., <br /> <br />~ <br /> <br />. <br /> <br />. <br /> <br />.. <br /> <br />. <br /> <br />(Insert in Procedure Guide following page V-7) <br /> <br />Added 15 September 1952 <br /> <br />., <br />~ <br /> <br />AWRBIAC PROCEDURE GUIDE <br />V. COORDINATING PROCEDURES (CONT 'D) <br /> <br />Coordination of work of first six ~roups. Step ~ndQ. During the <br />phases of preparation of report between 30 April 1952 ffi1d 31 December 1952 <br />(Schedule for Preparation of Report page VII-3), the work group findings <br />are adjusted to the standards of presentation and common criteria of project <br />selection. . <br /> <br />Water Use and Control Group. The State and Federal agencies, when <br />represented and acting in this capacity of specific.inter-group coordina- <br />. tion, are referred to as the Water Use and Control Group. <br /> <br />The AWRBIAC adopted (Meeting 5-52, 11-12 June 1952) the following <br />paper defining procedure of this Group: <br /> <br />(See following page) <br /> <br />V-7.1 <br />