My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11616
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 7:23:35 AM
Creation date
10/12/2006 5:04:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
7/1/1965
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />..'GGiCo::iJ <br /> <br />. <br /> <br />. <br /> <br />On the UPPER GUNNISON PROJECT collection of agricultural, economic, <br /> <br />and irrigation data is in progress on representative farms aelected for <br /> <br />evaluation in determining the scope of the feasibility studies to be under- <br /> <br />taken. <br /> <br />Tabulation of land classifieation data for the GRAND MESA PROJECT <br /> <br />has been completed. We have undertaken plan formulation studies and are <br /> <br />eontinuing studies on water exchanges and other involved water supply stud- <br /> <br />ies. The proposed report is scheduled for completion in F. Y. 1968. <br /> <br />Feasibility investigations on the modified plan for YELLOW JACKET <br /> <br />PROJECT, as discussed in our previous report to the Board, is progressing <br /> <br />satisfactorily. Preparation of design data, geologic investigations, and <br /> <br />preparation of project lands and drainage appendices are in progress. Coop- <br /> <br />erative plans for the project have been discussed with the Bureau of Sport <br /> <br />Fisheries and Wildlife. <br /> <br />/ <br />.., <br />./ Advanee Planning <br /> <br />On the FRUITLAND MESA PROJECT, negotiations for aerial topographic <br /> <br />maps of the project area have been completed with Michael Baker, Jr., Inc., <br /> <br />Jackaon, Mississippi. Advanee planning studies are underway on the BOSTWICK <br /> <br />PARK PROJECT. Advance planning studies are scheduled to be initiated on <br /> <br />the SAVERY POT HOOK PROJECT in F. Y. 1966 if funds become available. <br /> <br />Small Reclamation Projects ProKram" <br /> <br />The ORCHARD CITY IRRIGATION DISTRICT PROJECT is essentially eompleted. <br /> <br />On the RANGELY PROJECT, land classification performed by the Bureau <br /> <br />under contract with the Colorado River Water Conservation District has <br /> <br />been completed. Results of the studiea and maps have been forwarded to <br /> <br />the District. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.