My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11615
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11615
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:11 PM
Creation date
10/12/2006 5:04:43 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.40
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
3/1/1981
Title
Water and Power Resources Service - Southwest Region - to Rio Grande Compact Commission - March 1981
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br />~ <br />~ RIO GRANDE PROJECT, NEW MEYICO-TEXAS <br />.-l <br />t.:.,:t <br />~I The Rio Grande Project Offiee in El Paso, Texas, is responsible for O&M of <br /> <br />reserved works along the Rio Grande including Elephant 6utte Dam and Powerplant, <br /> <br />Caballo Dam, and diversion struetures. <br /> <br />Water Supply Conditions <br /> <br />The eombined storage in Elephant Butte and Caballo Reservoirs on January 17 at <br /> <br />the beginning of the 1980 irrigation season was 1,037,220 aere-feet. The <br /> <br />distriet's began their season with the full allotment of 3.0 aere-feet per aere, <br /> <br />which is 100 pereent of a full entitlement. <br /> <br />Combined storage in Elephant Butte and Caballo Reservoirs was 1,038,320 aere- <br /> <br />feet on February 4, 1981, when release of 600 ft3/s was begun for the El Paso <br /> <br />County Water Improvement Distriet (EPCWID) No.1. The Rio Grande Projeet water <br /> <br />in storage is above average for this time of the year. Thus, a full allocation <br /> <br />ean be given to the Republie of Mexico and to the two districts. <br /> <br />Irrigation and Drainage System <br /> <br />The Service eontinued to operate and maintain the distribution and drainage <br /> <br />facilities within the EPCWID through September 1980. Responsibility for <br /> <br />O&M of these facilities was assumed by the EPCWID on Oetober I, 19RO. <br /> <br />Responsibility for O&M of similar facilities within the New Mexieo portion of <br /> <br />the project was assumed by the Elephant Butte Irrigation Distriet (EBID) on <br /> <br />January 1, 1979. <br /> <br />The Serviee will continue to operate and maintain storage reservoirs and diver- <br /> <br />sions dams beeause of the two State entities involved and international water <br />
The URL can be used to link to this page
Your browser does not support the video tag.