My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11585
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11585
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:06 PM
Creation date
10/12/2006 5:03:54 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8445
Description
Union Park
State
CO
Basin
South Platte
Water Division
1
Date
10/1/1989
Author
WRC Engineering
Title
Engineering Report fo the Union Park Project Water Rights
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1. <br /> <br />Approach I: Simulation of the Historic Operation of the River System <br /> <br />Thi s approach simulates basically the historic operation of the <br />river system by existing water rights including C'~CB decreed minimum <br />stream flows. No conditional vlater rights were operated under this <br />approach. <br /> <br />The study periOd in this approach was from 1950 to 1986. The <br />recorded flows of Taylor River below Taylor Park Dam and the <br />reservoir releases were obtained from W. W. Wheeler and Associates. <br />With these two sets of data the divertable flows to the Union Park <br />Reservoir were determined according to the Following relationship. <br /> <br />Divertable flow to Union Park Reservoir <br /> <br /> <br />= Recorded flow of Taylor River at Taylor Park Dam - Historical <br /> <br /> <br />releases from Taylor Park Reservoir - Additional flow bypassed to <br /> <br /> <br />meet CWCB decreed mi nimum streamfl ow requi rements of Taylor Ri ver <br /> <br /> <br />below Taylor Park Dam (if releases did not meet minimum streamflow <br /> <br /> <br />requirenent) + Lottis Creek inflow. <br /> <br /> <br />Note: No rel eases from Union Park Reservoi r were made if recorded <br /> <br /> <br />flow did not meet minimum streamflow, however, no water was stored <br /> <br /> <br />in Union Park Reservoir at such til1es. <br /> <br />The CWCB minimum streamflow requirements are presented on Table / <br />IlI-5, and the monthly releases from the Taylor Park Reservoir are <br />presented on Table / III-G respectively. <br /> <br />-31- <br />
The URL can be used to link to this page
Your browser does not support the video tag.