My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11583
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:18:05 PM
Creation date
10/12/2006 5:03:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407
Description
Platte River Basin - River Basin General Publications
State
CO
Basin
South Platte
Water Division
1
Date
2/1/1963
Author
BOR
Title
Reconnaissance Report - Cache La Poudre Unit - Colorado - Longs Peak Division - Missouri River Basin Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />~"'." "'; "'3 <br />v.... "" ,., aot <br /> <br />Total annual O&M for all features would be ..........$531,100 <br />Total annual Replacement for all features would be .. 124,500 <br /> <br />Total Federal OM&R .......,......... $655,600 <br /> <br />An annual OM&R cost of $12,000 has been estimated for recreation <br />facilities. Since it is planned that the Bureau of Reclamation will <br />not administer these facilities, this cost is not included in the above <br />OM&R figure, However, the annual OM&R has been considered in the <br />allocation of costs and economic analysis. <br /> <br />First Stage Development <br /> <br />Idylwilde Dam and Reservoir, with provision for future powerplant, <br />could be constructed as a first stage development, The feature would <br />be the same size as proposed in the plan of development. It would be <br />constructed during the first 3 years of the construction period, and <br />used initially for functions other than power in much the same way as <br />proposed for the total development. <br /> <br />Table A.l.-.Estimated cost of proposed project by features <br /> <br />Feature <br /> <br />Cost <br /> <br />Idyl~dlde Dam and Reservoir <br />Kinnikinick Af'terbay and Dam <br />Cache la Poudre Forebay and Dam <br />Grey Mountain Dam and Reservoir <br />Rustic Diversion Dam <br />Elkhorn Conduit <br />Cache la Poudre PO<Ter Conduit <br />Idylwilde Powerpl.ant <br />Cache la Poudre Powerpl.ant <br />Transmission Lines <br />Swi tchyards and Substations <br />Communications Equipment <br />Recreational Facilities <br /> <br />$ 17,580,000 td <br />1,269,000 <br />3,ll5,000 .....1 <br />31,856,000 ~ <br />455,000 <br />9,933,000 <br />5,707,000 <br />4,369,000 ^I <br />27,447,000 ~ <br />3,140,000 <br />5,956,000 <br />81,000 <br />200,000 <br /> <br />$1ll,108,000 <br /> <br />Total <br /> <br />21 Includes costs for replacement or purchase of fish <br />rearing facilities <br />E! Includes costs for fish-wildlife mitigation <br />Sf Includes costs for fish-wildlife mitigation <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.