Laserfiche WebLink
<br />,-,', <br />)(=~~;(;;~~: <br />" .:~::. <br /> <br />, ,..,'~. <br />.',' ., <br /> <br />..,':....-':':; <br /> <br />.-.::~'::..::---. <br /> <br />tj~'C3 <br /> <br />001639 <br /> <br />Public Scoping Comments, Gunnison River Contract, conI. <br /> <br />19. <br /> <br />GREENO+; p9,'f3. Issue 1. Otber Related Projects - The EIS should document the <br />interrelationships of the proposed contract and the Aspinall Unit's operations with other existing and <br />proposed water projects in the Gunnison Basin including the Uncompahgre, Redlands, Paonia, Smith <br />Fork, Dallas Creek, Bostwick Park, Fruitgrowers, Rocky Point, Union Park, and Dominguez projects. <br />As with the AB uteraI Project, the wording of each alternative for contract language and the E1S <br />analysis of those alternatives sbould be explicit about the effect of the contract on these projects and <br />vice versa. <br /> <br />: <br /> <br />19. GREENO+; p9,'f3. Issue 1. Otber Related Proiects - The ElS should document the <br />interrelationships of the proposed contract and the Aspinall Unit's operations with other existing and <br />proposed water projects in the Gunnison Basin including the Uncompahgre, Redlands, Paonia, Smith <br />Fork, Dallas Creek, Bostwick Park, Fruitgrowers, Rocky Point, Union Park, and Dominguez projects. <br />As with the AB uteral Project, the wording of each alternative for contract language and tbe EIS <br />analysis of those alternatives sbould be explicit about the effect o(the contract on these projects and <br />vice versa. <br /> <br />2. <br /> <br />GREENO+; p9,'f4. Issue J. Aspinall Unit Pumoses - The Aspinall Unit purposes listed on page <br />8 of the April 1992 Public Information Packet are: <br />--regulating the flow of the Colorado River <br />--storing water for beneficial uses <br />--allowing the Upper Basin stales to utilize the apportionment made to and among them <br />through the Colorado River Compact and the Upper Colorado River Basin Compact <br />--reclamation of arid and semi-arid lands <br />--providing for flood control <br />--providing for fish and wildlife enhancement and for public recreation <br />--improving water quality <br />--providing for the generation of hydropower <br />GREENO+; plO,'IJ. The implications of each of these (Aspinall Unit) purposes for the <br />contract should be described in clear detail including their relative priority and intensity of <br />conflict. <br /> <br />11. <br /> <br />GREENO+; ppI4,'f5. m. Alternatives ~ Much more background data needs to be obtained before a <br />proper array of alternatives can be identified... <br /> <br />61 <br />