Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />1 <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />UPPER COLORADO RIVER RECOVERY IMPLEMENTA nON PROGRAM <br />COORDINATED RESERVOIR OPERATIONS <br />SUMMARY REPORT FOR 1999 <br /> <br />I. Introduction <br /> <br />The Water Acquisition Committee (WAC) of the Upper Colorado River Endangered Fish <br />Recovery Program (Recovery Program) proposed the Coordinated Reservoir Operations Study <br />(CROS), in 1994. The purpose of this study is to provide water in the IS Mile Reach of the <br />Colorado River for the benefit of the endangered fish by adding water back to the spring peak. <br />Recent Recovery Program research resulted in recommendations for spring flows of 12,900 cfs <br />or greater in the 15 Mile Reach of the Colorado River (USFWS 1995). These flows are <br />beneficial sediment movement, the scouring of spawning bars and reshaping of the channel to <br />improve and maintain desirable endangered fish habitat. This report serves as a summary for the <br />third year of joint reservoir operations with the following reservoir operators and participating <br />agencIes: <br /> <br />· U.S. Bureau of RecIamation (Bureau) <br />· Division 5 Engineer's Office <br />· Colorado Water Conservation Board (CWCB) <br />· Fish and Wildlife Service (FWS) <br />· National Weather Service (NWS) <br />· Colorado River Water Conservation District (CRWCD) <br />. Denver Water <br />· Northern Colorado Water Conservancy District (NCWCD) <br />· Southeastern Water Conservancy District (SEWCD) <br />. City of Aurora <br />. City of Colorado Springs <br /> <br />The objective of CROS is to coordinate bypasses of inflows from various reservoirs resulting in <br />enhancement of habitat in the IS-Mile Reach of the Colorado River without exceeding the <br />National Weather Service flood level of 26,600 cfs at Cameo. These bypasses may have passed <br />through the participating reservoirs during the runoff period. Coordinated reservoir operations <br />moves those bypasses to the peak of the runoff hydrograph to enhance spring peak flows, which <br />are important to spawning and improvement/maintenance of aquatic habitat. Coordination and <br />modification of operations are voluntary and occur within current authorizations and guidelines <br />and without affecting project yields to either federal or non-federal reservoirs. <br /> <br />The Feasibility Study conducted in 1995 to determine the benefit of these bypasses provided the <br />following: <br /> <br />. Analysis of potential operational alternatives <br />· Identification of constraints <br />· Listing of issues to be addressed by the Recovery Implementation Program (RIP) <br />· Process of coordination to enhance flows in the Reach. <br /> <br />A unified accounting system for the Colorado River used to account for contributions and <br /> <br />3 <br />