Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />INCREASED EIRM CAPACITY AVAILABLE-EQR SAl( <br />ION <br /> <br /> <br /> G ~ <br /> WI NTE R SUMMER WI NTE R SUMMER <br /> --111L- MW ~ MW <br />COLLBRAN 14.0 14.0 14.0 14.0 <br />RIO GRANDE 0.0 9.0 27.0 27.0 <br />PROVO RIVER ....Q..Jl -'..Jl -M --5...Q <br /> 14.0 25.0 46.0 46.0 <br /> <br /> <br />NET INCREASE DUE TO INTEGRATION <br /> <br />32.0 <br /> <br />21.0 <br /> <br />ESTIMATED REPLACEMENT VALUE @ $20.00 KW-MoNTH: $6.360.000.00 <br />