Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> <br />CASE #2 <br />CUSTOMER MAXIMUM DEMAND <br />SEASONAL ENER~Y REQUIREMENTS <br />SEASONAL LOAD FACTOR <br /> <br />,. 20.000 KW <br />,. 54.399.600 KWH <br />,. 62.1% <br /> <br />COMMITMENTS FROM S~ <br />MAXIMUM MONTHLY OBLIGATION ,. 10.000 KW (501 OF DEMAND) <br />SEASONAL ENERGY ,. 21.100.000 KWH <br />(10.000 KW X 2110 KWH/KW) <br /> <br />MINIMUM SCHEDULE ,. 3.131 KW <br />... --- -... -~-~ ----.-- .. <br />(21.100.000 KWH/4.380 HRS. X 65%) <br />ENERGY ASSOCIATED <br />WITH MINIMUM SCHEDULE a 13.713.780 KWH <br />(3.131 KW X 4.380 HRS.) <br />OFF PEAK PORTION ,. 5.873.756 KWH (27.8%) <br />ONPEAK PORTION ,. 7.840.024 KWH (37.21) <br /> <br />,GUSTO.ME. R, USE OF SLCA-IP RESOURCE ,. 6.869 KW PEAKING RESOURCE <br />@ 24.61 LF. .. <br />(7.386.220 KWH) <br />3.131 KW BASE LOAD RESOURCE <br />@ 1001 LF <br />(13.713.780 KWH) <br />