Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />CUSTOMER USE OF SLCA-IP RESOURCE <br /> <br />1",----- ", ...,-- n.., <br /> <br /> <br />I <br />I <br /> <br /> <br />CASE #1 <br /> <br />CUSTOMER MAXIMUM DEMAND = 20.000 KW <br />SEASONAL ENERGY REQUIREMENTS = 54.399.600 KWH <br />SEASONAL LOAD FACTOR = 62.1% <br /> <br />COMMITMENTS FROM S~ <br />MAXIMUM MONTHLY OBLIGATION <br /> <br />. <br /> <br />2000 KW (10% OF DEMAND) <br /> <br />SEASONAL ENERGY <br /> <br />. 4.220.000 KWH <br />(2.000 KW X 2110 KWH/KW) <br /> <br />MINIMUM SCHEDULE . 626 KW <br />(4.220.000 KWH/4.380 HRS. X 65%) <br /> <br />ENERGY ASSOCIATED WITH <br /> <br />OFFPEAK PORTION <br /> <br />MINIMUM SCHEDULE . 2.741.880 KWH. <br />(626 KW X 4.380 HRS.) <br />. 1.174.376 KWH <br />. 1.567.504 KWH <br /> <br />(27.8%) <br />(37.1%) <br /> <br />ONPEAK PORTION <br /> <br />. 1374 KW PEAKING RESOURCE <br />@ 24.6% LF. <br />(1.478.120 KWH) <br />626 KW BASE LOAD RESOURCE <br />@ 100% LF <br />(2.741.880 KWH) <br />