My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11523
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:17:46 PM
Creation date
10/12/2006 5:01:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
9/7/1983
Author
USCOE/WAPA
Title
Public Information Forum on Proposed Post-1989 Power Marketing Criteria
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I' <br />I <br />I <br />I <br />I' <br />I <br /> <br />S <br /> <br /> <br />CUSTOMER'S <br />~/3-YRS. <br />UM OF <br />ASPL/3-YRS. <br /> <br />.. <br /> <br />Y <br />TOTAL ENERGY IN <br />RESOURCE POOL (5-6) <br /> <br />Y .. ENERGY ALLOCATION TO CUSTOMER <br /> <br />CUSTOMER B: <br />ASPLl3 YRS. <br />SUM OF <br />ASPL/3 YRS. <br /> <br />.. <br /> <br />100 MW AND 219.000 MWH <br /> <br />.. <br /> <br />500 MW <br /> <br />ENERGY IN RESOURCE POOL FOR ND/SLCA. SUMMER (#6) .. 106.000 MWH <br />(PLANT FACTCR OF 2110 KWH/KW) <br /> <br />ALLOCATION OF ENERGY TO CUSTOMER B: <br />~ ".2 X 106.000 MWH .. 21.200 M~~ <br /> <br />POSSIBLE LIMITS: <br /> <br />25% X 219.000 MWH .. 54.750 MWH - 0 .. 54.750 MWH <br />(DOESN'T APPLY) <br />10.000 KW X 2110 KWH/KW" 21.100.000 KWH <br />-21.100 MWH .. ALLOCATION TO CUSTOMER B. <br />
The URL can be used to link to this page
Your browser does not support the video tag.