<br />8 <br />.. <br />CII' ':3'" <br /> <br />32 <br /> <br />~I E T R 0 POLl TAN W ATE R D 1ST R leT <br /> <br />A shutdown of the entire upper feeder system was made on <br />March 21. 1950, the fir~t since March 1949. Refilling of the feeder <br />was started the next day and normal service was l'estored at all <br />locations on March 25, 1950. The threefold PUI'pose of the shutdown <br />was to permit District crews to make a connection on the upper <br />feedel' for the City of Pasadena's Hastings reservoir, to install three <br />Tlew butterfly valves at the distribution system head works at Lake <br />Mathews, and to install the new gate guides in the present gate <br />frames of the mixing basins at the softening plant. At the same <br />time the softening plant and portions of the upper feeder and the <br />Santa Monica feeder were drained to permit maintenance work and <br />inspections. The special maintenance work at the softening plant <br />is described elsewhere. Other maintenance work performed that <br />could only be done during a system shutdown included the installa- <br />tion of a lO-inch vacuum valve and gate valve at Mountain Street <br />and Martelo Avenue in Pasadena to replace the former 8-inch in- <br />stallation, which was too small to permit rapid release of air during <br />retilling operations, Also an 8-inch vacuum vah'e and gate valve <br />installation was made on Mountain Street near Mar Vista Street. <br />Gear heads to provide for vertical valve operating stems were in- <br />stalled on 16 gate valves in vacuum valve structures between Lake <br />Mathews headworks and the Jurupa Mountains on the upper feeder, <br />Corroded fittings were removed and replaced in air release struc- <br />tures of the Santa Monica feeder and on the upper feeder between <br />Eagle Rock and the east portal of Pasadena tunnel. While portions <br />of the line were dewatered, an inspection of about 3 miles of the <br />interior of the enamel-lined steel pipe of Schedule 2S of the upper <br />feeder, crossing the valley of the Santa Ana River, revealed the <br />lining to be in excellent condition. During the short shutdown period <br />Pasadena supplied its own requirements from storage and local sup- <br />plies; Santa Monica was furnished exchange water by the District <br />through the Manning A venue connection with the Los Angeles city <br />system in West Los Angeles; requirements of the Los Angeles har- <br />bor area, Long Beach, Compton, and Tormnce were supplied from <br />storage in Palos Verdes reservoir; and Orange County agencies <br />were supplied from Orange County reservoir. <br />A portion of the Palos Verdes feeder was dewatered from Decem- <br />ber 18 to 23, 1949 to permit the installation by the construction <br />contractor of a tee section in the line to prodde a turnout for the <br />new Victoria Street lateral, and also to permit the installation of <br />new valves at the pressure regulating structures at Washington <br />