<br />. <br /> <br />The CWCB agreed to the contract for an additional 21,650 acre-feet of water from <br />Ruedi reservoir this year. The amendment to the biological opinion was issued on <br />January 6, allowing the Round II contracts to go forward, <br /> <br />II. Habitat Restoration <br /> <br />Goal: To provide or enhance habitat for the rare fishes through habitat development or <br />management measures such as: <br />. fish passageways <br />. restoration of flooded bottomland habitats, <br /> <br />Status: . <br /> <br />The fish ladder at Redlands Diversion Dam on the Gunnison River has been <br />operational since June 1996, The ladder has been used primarily by native <br />fishes, including 41 Colorado squawfish, Two of the squawfish have used the <br />ladder twice, Native fishes that were marked and released above the dam <br />dispersed upstream, some as far as 57 river miles to the base of the Hartland <br />Diversion Dam, <br /> <br />. <br /> <br />A fish passage structure was constructed at the Grand Valley Irrigation Company <br />Diversion Dam on the Colorado River in January 1998, Ten adult Colorado <br />pikeminnow were captured above the GYIC dam between 19 August and 24 <br />September 1998, It is unknown whether these fish used the fish passage structure or <br />swam over the dam during high spring flows, Providing fish passage at this <br />structure, Pricc-Stubb, and the Grand Valley Project Diversion Dam will restore 55 <br />miles of historically-occupied habitat for endangered fishes, <br /> <br />. <br /> <br />Design options have been developed for restoring fish passage at the Price-Stubb <br />Diversion Dam, Construction was tentatively scheduled to begin in the fall of 1998, <br />However, complex issues (e,g" potential effects of passage restoration on railroad, <br />highway, Reclamation's siphon, and Ute pumping; ownership of property and FERC <br />license) have caused delays, Construction is now expected prior to runoff in FY 00 <br /> <br />. <br /> <br />Pre-construction activities are on-going through FY 99 to restore fish passage at the <br />Grand Valley Project Diversion Dam, Construction is scheduled to begin during FY <br />2000, <br /> <br />. <br /> <br />Between March \997 and March 1998, levees were breached at 8 sites along the <br />Green River, resulting in ]216 to 1734 f100dablc acres (depending on flows), and <br />filling out the 8-site block design recommended by the Levee Removal Evaluation <br />Group and subsequently approved by the Biology and Management committees, A <br />report based on preliminary results of data collected from 1996 through 1998 was <br />submitted to the Recovery Program in December 1998, <br /> <br />. <br /> <br />Both public and private lands continue to be screened for contaminants and relative <br />floodability (pre-acquisition; pre- and post-restoration), Land acquisition activities <br /> <br />3 <br />