<br />ALGONQUIN GAS TRANSMISSION CO.
<br />Fi1inC ot Substi1uta Tariff Sheet
<br />OcT08E1l 20. 1915.
<br />Take noUce that all October 3. 1975,
<br />Algonquin Gas TransmJsslon Company
<br />(Algonquin Gas) tendered tor ruing Sub-
<br />sUtute Ninth Revised Sheet No. 10. AI.
<br />gonquin Gas 8ta.tes the reason for the
<br />ftllng is 10 Include In such shed the cor-
<br />rectlon to the base ta.rUf ra.tes as re-
<br />Deeted 1n Mg'onquin Gas' (Corrected)
<br />Sub6t1tute Eighth Revised Sheet No. 10
<br />and the change in Ita COGt of purchased
<br />gas as refiected in TeJII:1I.S Eastern's
<br />Fourteenth RevL5ed Sheet. No. H-D, filed
<br />on September 26, 197~.
<br />Algonquin Gas reQtWils that SUbf;U-
<br />tute NlnUl Rev~ed Sheet No. 10 repla.ct'
<br />Ninth Revised Sheet No. 10, and in fur-
<br />therance thereof. requests a.ny wa.lvel'5 of
<br />the COl:IUnl.sslon's RegulaUons deemed
<br />necessary to accomplish th1!I.
<br />Algonquin Gas states a copy ot Ul1!
<br />IDlng Is being 5erved on aU customers
<br />and interested state commissions.
<br />Any person des1r1n,g to be heard or to
<br />protest said tu.i.ng lbauld tUe a petition
<br />to intervene or protest. ..1tb the Federal
<br />Power Commlsslon, 825 North Capitol
<br />Street, Ni,:., Washt11gtDn. D.C. 20426. In
<br />accordance 'Io1th Sections 1.8 and 1.10
<br />or tl1e Conuntssion's Rules ol Practice
<br />and Procedure 08 CPR 1.8, 1.10), All
<br />1uclJ, petitions or protests should be tiled
<br />on or before Oct.ober 28. HI75. Protests
<br />will be considered by the Commission in
<br />dcterm1nJog the appropriate a.cUon to
<br />be taken. but wW not &en-e to make pro-
<br />testant. parties to U:1e proceeding. Any
<br />person w1slllnK to become a party must
<br />file a petition to Intervene. CopIes ol th1s
<br />filIng are on fUe with the Cbauntssion
<br />and are available for publIc 1nspectloIL
<br />KxNNETH F. PLUMI.
<br />Secretar..
<br />1m Doc.13-:l886& FlIed 1(t.-M-75;8;ol5 amI
<br />
<br />BOSTON EDISON CO.
<br />IDocke1;Noa.!:R76--",.~.1
<br />ORDER ACCEPTlNG FOR flUNG PRO-
<br />POSEO RATE SCHEDULE, INSTITUTING
<br />0!06 INVESTIGATION, ESTABUSHING
<br />PROCEDURES. AND CONSOUDATlNG
<br />PROCEEDINGS
<br />
<br />OcrollEa 20, 1975.
<br />On September 2. 1975. Boston Edison
<br />Company (EdIson) tendered lor 1Uing u
<br />an lnJt1al rate schedule' a Unit Power
<br />Agreement wllb New England Power
<br />Company CNEPCO>' Under the rued rate
<br />acbedule Edison w1ll make anllable to
<br />NEPCO on a unit contract basts 6.82'10
<br />ot the capacity and as.soc:1ated energy
<br />, from Edison's Mystic unIt No. '1 (Unit>
<br />for the period No\'(~mber I, 1915 throUih
<br />October 31,1916.
<br />Public notice ot the filing ~-as 1s.sued
<br />on september 10. 1915. wIth protests or
<br />peUUOOl to intervene due on or before
<br />
<br />. J:lieIa1fnated: ~toll UI~ CQOlpal\Y Rate
<br />tichedule FPC l"o, 109.
<br />
<br />NOTICES
<br />
<br />September 22. 1975. No timely responses
<br />9i'ere received. Edison has requested that
<br />the rate schedule be made etTecU\'e a3 of
<br />Oct<lber 2,1975.
<br />Edison states that the proposed rates
<br />are designed to reimburse Edls<Jn for
<br />6.82% of the fixed and operatl.ng costs
<br />of the Unit and urtain associated trans-
<br />mlulon facilities. Capacity charges are
<br />determined by a cost-ol-service formula
<br />desIgned to l'eOO\'l'r all non-tuel costs as.
<br />soclated wIth the Unit and certaul trans-
<br />missIon laelllties linking the Unit wItb
<br />Edlson'l) N<lrtl1 CambrIdl,::e Substat.lon No,
<br />509. Energy charges ilN! based on Edt.
<br />son's fuel eJlpense tor t.he Unit..
<br />Delivery ot the UnIt entiUement 1.5 to
<br />be made at Ule 345 KV bus of Substation
<br />No. 509, with delh'eries beyond that pomt
<br />to be In accordance with the New Eng-
<br />land PO~'er Pool (NEPOOL) Agreement.
<br />We note that Pool Trall.'llIllsslon Faell-
<br />UIl"S (PTF) cost rules are currentJy under
<br />lnVC5tJgaUon In New England Power
<br />Pool Agreement, Docket No. E-7690 (PTP
<br />Cost Rules). Accordingly. that part- of
<br />NEPCO'8 transmission charges asso-
<br />elated with NEPOOL PTP costs wlll be
<br />made subject t.<J the outcome of the pro-
<br />ceedings in Docket No. E-1690 (PTP C<J:st
<br />Rules>.
<br />our revIew indicates that the propo.sed
<br />rates, charges, terms, and condltlona of
<br />servIce- ot the proposed rate schedule
<br />have not been shown to be just and rea-
<br />sonable and may be unjust. u.nnawn-
<br />able, unduly di.scrtm1nawl'J'. preferential
<br />or othcn1se unlawful. Accordingly. we
<br />t.haJl B.CC('pt Ute proposed rate schedule
<br />tor tiling t.o become etrecUve Oct.<Jber 2.
<br />1975, as requested. and shaJ.lln.sUtute an
<br />lnvesUgatlon Into tile law1uln~ of the
<br />proposed ra&e schedule punulInt to the
<br />C:olllDlis61oo's authority wldar Section
<br />206 of the Federal Power Act..
<br />We note that the rates and charges
<br />contained within the instant rate sched-
<br />ule are the subjed of an exlstlna- Inves-
<br />UgaUon lnJtiated by our Order ot July
<br />31. 1975, In Docket Nos. E-.S364, and E-
<br />9366. Tht-refore.lt Is appropriate that the
<br />In\'cstlgaUon herein ordered be consoU.
<br />dated w1Ul Docket Nos. E-9364, and E-
<br />9366 tor purpo.sesot hearing and de.::lston.
<br />The Com"J-wWn ftnd.1'.-(l) It fa nec-
<br />essary and proper In \he public interest
<br />snd to aid in the enforcement of the
<br />Federal Power Act, that tbe Commission
<br />institute a Section 206 invesUlaUon and
<br />hear1ni concem1ng the lawfulness or the
<br />1nltlal rate schedule tendered by EdIson
<br />in Docket No. ER76-96 and that such
<br />rate scbedule be accepted tor lUlng.
<br />(2) Good cause CJllst6 to consoIldate
<br />the Investigation berein <lrdered v.1tb the
<br />proceedings in. Docltet NOli. E-936{ and
<br />E-9366.
<br />(3) Those transmissJ.on cbarges ILSSG-
<br />eluted. with NEPOOL PTP costs should
<br />be subje.::t to the outcome or the pro-
<br />ceedlnga In Docket No. E-169O (PTP Cost
<br />Rules).
<br />The Crmu"wlon orden.-(A} Edison's
<br />tnitlaJ rate schedule tendt!red on SeP-
<br />tember 2, 1975, Is hereby accepted for
<br />tu1ng t<J become etrectiye October 2, li'l5.
<br />(B) Punu:mt to L~e authority <lr the
<br />Federal Power Act. particularly sectlon
<br />
<br />5011:1
<br />
<br />206 therwf, and the CommissIon's Rules
<br />and Regulations. an investigation con.
<br />cernlng the Inwtulne6ll and ren.sonable_
<br />ncss ot the iNbJect in1t1al rate schedule
<br />is hert-by lnlUated.
<br /><C) The proceedings Instituted here-
<br />In shall be (:<lll&(llidated for purPOaes or
<br />investigation, hearlni and decision with
<br />those estab~bed b)' order issued July 31.
<br />1975. in Docket Nos. E-9364 and E-9366.
<br />,,;jUt the procedural schedule as estab-
<br />lished i.n that order to iovern.
<br />(D 1 Those transmission. charges paid
<br />by NEPCO assoctated with NEPOOL
<br />PTP C06t.s sba.ll be made subject to the
<br />outcome of the proceedings now pending
<br />111 Docket No. E-7690 (PTP Cost Rules).
<br />(E) The CommIssIon Secretary shall
<br />cause prompt publication of thb order In
<br />the FEDERAL REctsn:ll.
<br />By the CommissIon.
<br />[SI:ALl Knn~E'l1I F. PLUKB,
<br />Secrelarll.
<br />JFR Due.75-288?OPUod to-2.....16;8:41511m1
<br />
<br />IProJecl Ho. 2'7511
<br />COLORADO RMR WATER
<br />CONSERVATION DISTRICT
<br />~lotice of AppliCatlon for Preliminary
<br />Permit
<br />Ocroua21.1915.
<br />Public notice Is hereby given that ap-
<br />plication for prellm1nary permit was
<br />ftled on Augun .. 1915, under the F'edP
<br />eral Power Ac' 015 U.S.C. 1791&-825r)
<br />by Colorado RIver Water Conservation
<br />District (COrrNpOlldenee to: Mr. Roland
<br />C. F1scher, 5ecretary-Engtneer, Colorado
<br />RIver Water CoIUlernUon DIstrict, P.O.
<br />Box 1120, Glenwood Sprinp, Colorado
<br />81601; Mr. Ke'rUleth Baloomb, Delaney
<br />& Balcomb. P.O. DraVo'er 790, Qlenwood
<br />Sprtngs, Colorado 611501; and Mr. RObert
<br />L. McCarty, McCarty and Noone. 1225
<br />Connecticut Avenue N.W.. Washlngton.
<br />D.C. 20036) tor propost'd Project No,
<br />2757, to be known 88 the JunJP'""y..cr~
<br />Mountain Project, located 10 Motrllot
<br />County, Colorado, on the Ya.mpa River.
<br />According to the appllcatlon, the pro-
<br />posed Junlper-ct'oM Mountain Project
<br />would involve two dams and rrservolrs
<br />an the main channel of the Yampa Rtver
<br />In Molfat County, COlorado.
<br />The Juniper Development of the proj-
<br />ect would consist ot: U) a 210-foot.hl$h
<br />concrete arch dam located in the east
<br />halt ot Section 18, T. 6 N., R. 94 W,. in
<br />the vicInity of MaybeU, Colorado, on the
<br />Yampa River about 25 mUes southwest
<br />of craig, Colorado; (2) a storage reser-
<br />voir wIth a maximum water level at e1e-
<br />vatton 6,125 feet and B m1nimum tall-
<br />,,"'ater level at e1evaUon 5,950 feet; and
<br />(3) a diverstoa tunnel leading to l!.
<br />powerh~u!e cont.a1ning three IS,OOO kW
<br />generating units.
<br />The Cf06S Mountain Development of
<br />the project would oousist of: (1) a 260-
<br />toot.hJgh (:ClDCrete arch dam located
<br />downstream trom Juntper Dam and
<br />about SO mDea west or CrnJg, Colorado,
<br />near the downstream end ot Cross
<br />Mountain Canyon on the Yampa River:
<br />
<br />J
<br />I
<br />
<br />j
<br />I
<br />
<br />I
<br />
<br />I
<br />
<br />fEOUAl lfGnTU, VOL 40. NO. 20I-TUESDA.'I', OCTOBER 11, 1915
<br />
|