Laserfiche WebLink
<br />.... <br />en <br />~ <br />w <br /> <br /> 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 < <br /> , <br />PARADOX VALLEY UNIT DPR-Final EIS Construction <br />LAS VEGAS WASH UNIT DPR-Final EIS Verification studies <br />CRYSTAL GEYSER Unit Deferred Indefinitely <br />GRAND VALLEY UNIT <br />STAGE 1 DPR--Draft EA. Environ.-Neg. Det. Construction Full Operation <br />GRAND VALLEY UNIT l <br />STAGE 2 <br />LAVERKIN SPRINGS Status Report Unit Deferred Pending Special StudieS <br /> Advance <br />LOWER VIRGIN RIVER Feasibility Report-Final EIS Review. Authorization Planning-DPR <br />GLENWOOD-DOTSERO Appraisal <br />UNIT Report Feasibility Report-Final EIS Review. Author <br />PALO VERDE UNIT Special Report Status Report Verification studies <br />COLO RIVER INDIAN UNIT Special Report Status Report Unit Deferred Indefinitely <br /> Authori- <br />UINTA BASIN UNIT Feasibility Report-Final EA Review' zation Ac <br />LOWER GUNNISON UNIT Feasibility Report-Final EA Review' Authorization Advance PI, <br /> . <br /> Author <br />BIG SANDY UNIT Feasibility Report-Final EIS Review. zation <br />MCELMO CREEK UNIT Feasibility Report-Final EIS Review' I Authorizatio <br />MEEKER DOME UNIT Problem ID & Quantification Verification studies <br />PRICE - <br />SAN RAFAEL RIVER UNIT Feasibility Report-Final EIS I <br />DIRTY DEVIL RIVER UNIT Feasibility Report-Final EIS <br />PIPELINE COLLECTOR Appraisal <br />SYSTEM Report Feasibility studies <br />ENV. STATEMENTS Final EIS-CRWQIP Basinwide Statement Deferred. <br />WATER QUALITY Status Draft Plan <br />SALINITY STANDARDS Report of Study Update Model Studies Update Update <br /> <br />. Review by Dept. of Interior, WRC, OMB, and EPA (for EIS). <br />