Laserfiche WebLink
<br />. <br /> <br />[6450-01J <br />DEPARTMENT OF ENERGY <br />WESTERN AREA POWER ADMINISTRATION <br />POST-1989 GENERAL POWER MARKETING AND ALLOCATION CRITERIA I <br />AND CALL FOR APPLICATIONS FOR POWER <br /> <br />AGENCY: Department of Energy, Western Area Power Administration <br /> <br />ACTION: I Post-1989 General Power Marketing and Allocation Criteria <br /> <br />SUMMARY~ The Post-1989 General Power Marketing and Allocation <br />Criteria (Criteria) for the disposition of capacity and energy from <br />the Colorado River Storage Project (CRSP), and the Rio Grande and <br />Co11bran Projects by the Western Area Power Administration (Western) <br />is published herein, together with a discussion of the relevant issues <br />raised in the comments received on the September 4, 1984, Revised <br />Proposed Post-1989 General Power Marketing and Allocation Criteria' <br />(1984 Proposed Criteria), 4~ FR 34900. A detailed discussion of these <br />issues and resulting changes to the 1984 Proposed Criteria precede the <br />Criteria in this publication. This notice also constitutes a formal <br />request for applications for power and contains a description of the <br />content of such an application. Applications will be considered by <br />Western's Administrator in the determination of proposed allocations <br /> <br />to eligible applicants. These proposed allocations will be published <br />in a future FEOERAL REGISTER notice. Comments on these proposed <br />allocations will be accepted and any appropriate adjustments will be <br />made. Negotiation of electric service contracts will then follow. <br />