My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11296
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:53 PM
Creation date
10/12/2006 4:52:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1967
Author
USDOI
Title
Eleventh Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Storage Units <br />Curecanti <br />Flaming Gorge <br /> <br />Glen Canyon <br />Navajo <br /> <br /> <br />COLORADO RIVER STORAGE PROJECT <br />AND <br />PARTICIPATING PROJECTS <br /> <br />LEGISLATIVE AUTHORIZATION <br />AND <br />REPORT REQUIREMENTS <br /> <br />The Colorado River Storage Project and eleven participating projects <br />were authorized by the Act of April 11, 1956 (70 Stat. 105); the San <br />Juan Chama and Navajo Indian Irrigation Participating Projects were <br />authorized by the Act of June 13, 1962 (76 Stat. 96); and the Bostwick <br />Park, Fruitland Mesa, and Savery-Pot Hook Participating Projects 'Jere <br />authorized by the Act of September 2, 1964 (78 Stat. 852). <br /> <br />Section 6 of the authorizing act stipulates that on January 1 of each <br />year the Secretary of the Interior shall report to the Congress for the <br />previous fiscal year upon the status of revenues from, and the cost of, <br />constructing, operating, and maintaining the Colorado River Storage <br />Project and participating projects. The Secretary I s report shall be <br />prepared to reflect accurately the Federal investment allocated at that <br />time to power, to irrigation, and to other purposes, the progress of re- <br />turn and repayment thereon, and the estimated rate of progress, year by <br />year, in accomplishing full repayment. <br /> <br />AUTHORIZED UNITS AND PROJECTS <br /> <br />, <br /> <br />Participatin~ Projects <br />Colorado: <br />Bostwick Park <br />Florida <br />Fruitland Mesa <br />Paonia <br />Pine River Extension l! <br />Silt <br />Smith Fork <br />COlOrado-Wyoming: <br />Savery-Pot Hook <br />Colorado-New Mexico: <br />San Juan Chama <br /> <br />New Mexico: <br />Hammond <br />Navajo Indian Irrigation <br />Utah: <br />-central Utah <br />Bonneville Unit <br />Jensen Unit <br />Upaleo Unit <br />Vernal Unit <br />Emery County <br />Wyoming: <br />La Barge y <br />Lyman <br />Seedskadee <br /> <br />1/ <br /> <br />y <br /> <br />On September 25, 1959, a recommendation was made to the Congress <br />that construction of this project be deferred indefinitely. <br /> <br />Construction deferred indefinitely as suggested in Senate subcommittee <br />appropriation hearings for F.Y. 1962. <br />
The URL can be used to link to this page
Your browser does not support the video tag.