My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11296
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11296
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:53 PM
Creation date
10/12/2006 4:52:18 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.40
Description
CRSP
Basin
Colorado Mainstem
Date
6/30/1967
Author
USDOI
Title
Eleventh Annual Report on the Statuts of the Colorado River Storage Project
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />2. COST OF CONSTRUCTING, OPERATING, <br />AND MAINTAINING THE PROJECT <br /> <br />Page 6 <br /> <br />The following units and participating projects of the Colorado River <br />Storage Project were previously reported as substantially completed. <br />Additional details and statistical data for these entities are Sh01ID <br />under Exhibit C attached. <br /> <br />Flaming Gorge Unit <br />Navajo Unit <br />Central Utah Project (Vernal Unit) <br />Emery County Project <br /> <br />Florida Project <br />Hammond Project <br />Paonia Project <br />Smith Fork Project <br /> <br />The cost of constructing and operating t1)e project to June 30, 1967, is <br />reflected in the following attached financial 8xhibits: <br /> <br />Exhibit A - Comparative balance sheet at June 30, 1967, and <br />June 30, 1966. <br /> <br />Exhibit B - Statement of source and application of funds and <br />other credits as of June 30, 1967. <br /> <br />Exhibit A sets forth comparatively the financial condition of the project <br />at June 30, 1967, and June 30, 1966. The cumulative funds and other <br />credits available to the project at June 30, 1967, and the manner in <br />which such funds and credits were used or applied are set forth on Ex- <br />hibit B. <br /> <br />These costs are summarized as follows: <br /> <br />Activity <br /> <br />Construction costs: <br />Construction work in progress------------------- <br />Completed plant in service---------------------- <br />Property transfers ----------------------------- <br />Service facilities (net)------------------------ <br />Investigation costs----------------------------- <br />other Physical Property------------------------- <br />Operation and maintenance expenses----------------- <br />Working Capital----~------------------------------- <br />Funds returned to U.S. Treasury-------------------- <br />Interest on Investment----------------------------- <br />Total <br /> <br />Cost to Date <br /> <br />$157,590,960 <br />551,926,852 <br />111,925 <br />3,605,128 <br />3,532,754 <br />7,025,406 <br />32,281,349 <br />10,332,517 <br />152,565 <br />1~ 41t 068 <br />~77 :97 :524 <br /> <br />Details ,~th respect to the foregoing, identified by project or activity, <br />are shown respectively on Schedules Nos. 1, 2, 3, 4, and 6 and Exhibit B <br />attached. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.