My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11284
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:50 PM
Creation date
10/12/2006 4:52:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1966
Author
Unknown
Title
Quarterly Reports - Arizona-Colorado-Nevada - 1966-1967
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- <br /> <br />:'1'1::85 <br />Oul,).. . <br /> <br />.'e <br /> <br />. <br />. <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br /> <br />66-3 Meeting <br /> <br />construction <br /> <br />Blue Mesa Dam of the CURECANTI UNIT .is essentially com- <br />plete. At the present time the reservoir is at rated head eleva- <br />tion 7,438 and extends approximately 18 miles upstream from the dam. <br />storage amounts to 360,627 acre-feet. It is anticipated that the <br />reservoir storage will be reduced gradually between now and the flood <br />season next year, reaching a minimum water content of 325,000 acre- <br />feet and a water elevation of 7,430 in March of 1967. When the reser- <br />voir is full the water surface elevation will be 7,519 with a length <br />of 24 miles. Capacity at that elevation will be 940,755 acre-feet. <br /> <br />construction at Morrow Point Dam has passed the halfway <br />mark with the contractor showing 58% completion on July 3.1. A total <br />of 182,000 cubic yards of concrete has been placed, and the highest <br />block of concrete is about 260 feet above the lowest bedrock. Dur- <br />ing July 33,246 cubic yards of concrete were placed. <br /> <br />All excavation work in the underground powerplant has been <br />completed and 2,000 cubic yards of concrete have been placed in the <br />structure. <br /> <br />Construction on the SILT PROJECT is well advanced. The <br />dam is 70% complete and the dam and road will be completed on <br />schedule early in 1967. <br /> <br />Advance planning <br /> <br />Advance planning on the FRUITLAND MESA PROJECT is proceed- <br />ing on schedule with the definite plan report anticipated in December <br />of 1966. If funds are appropriated construction will start in fiscal <br />year 1968. <br /> <br />All advance planning for the BOSTWICK PARK PROJECT has <br />been completed. plans and specifications for the Silver Jack <br />reservoir dam have been prepared, and bids will be opened in Mont- <br />rose, Colorado, on September 8, 1966. <br />
The URL can be used to link to this page
Your browser does not support the video tag.