<br />001.5'3t\ <br /> <br />. <br /> <br />. <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br /> <br />67-2 Meeting <br /> <br />Construction <br /> <br />The completion contract at Blue Mesa Dam is about 80 percent <br />complete. Because some delay has been experienced in installation <br />of the turbines and electrical work, it is now estimated that the <br />first generator will go on the line sometime in July, rather than <br />June. <br /> <br />Concrete placements in Morrow Point Dam were started for the <br />season on March 27. The dam will be topped out this sumrner--prob- <br />ably about the end of August. The contractor has been busy t.hrough <br />the winter on other phases of the work. He has completed placement <br />of concrete in the underground powerplant; has completed the con- <br />crete work in both penstocks and in both draft tube tunnels; and <br />is placing concrete in the stilling basin and the weir. Work is <br />also progressing on excavation of the river channel downst.ream <br />from the dam and installation of the 2S0-ton powerplant overhead <br />crane. Overall completion of the contract is about 80 percent. <br /> <br />The Silt Project near Rifle, Colorado is essentially complet.e. <br />Irrigation water will be delivered from the Rifle Gap reservoir <br />this summer. <br /> <br />Modification of the diversion works for the Smith Fork Feeder <br />Canal of the Smith Fork Project is essentially completed. <br /> <br />The contractor at Silver Jack Dam, Bostwick Park Project, has <br />resumed work aft.er being shut down since last November. Last fall <br />the damsite area was cleared and stripping operations were nearly <br />completed. <br /> <br />The contract for repairs to the lining of the Gunnison Tunnel <br />on t.he Uncompahgre Project was completed on March 22, 1967. <br /> <br />Transmission Svst.em Operation <br /> <br />The interconnection of power systems of the East and West, <br /> <br />i; <br />