My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11284
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:50 PM
Creation date
10/12/2006 4:52:12 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
1/1/1966
Author
Unknown
Title
Quarterly Reports - Arizona-Colorado-Nevada - 1966-1967
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001.5'3t\ <br /> <br />. <br /> <br />. <br /> <br />PACIFIC SOUTHWEST INTER-AGENCY COMMITTEE <br />Quarterly Report for Colorado <br /> <br />67-2 Meeting <br /> <br />Construction <br /> <br />The completion contract at Blue Mesa Dam is about 80 percent <br />complete. Because some delay has been experienced in installation <br />of the turbines and electrical work, it is now estimated that the <br />first generator will go on the line sometime in July, rather than <br />June. <br /> <br />Concrete placements in Morrow Point Dam were started for the <br />season on March 27. The dam will be topped out this sumrner--prob- <br />ably about the end of August. The contractor has been busy t.hrough <br />the winter on other phases of the work. He has completed placement <br />of concrete in the underground powerplant; has completed the con- <br />crete work in both penstocks and in both draft tube tunnels; and <br />is placing concrete in the stilling basin and the weir. Work is <br />also progressing on excavation of the river channel downst.ream <br />from the dam and installation of the 2S0-ton powerplant overhead <br />crane. Overall completion of the contract is about 80 percent. <br /> <br />The Silt Project near Rifle, Colorado is essentially complet.e. <br />Irrigation water will be delivered from the Rifle Gap reservoir <br />this summer. <br /> <br />Modification of the diversion works for the Smith Fork Feeder <br />Canal of the Smith Fork Project is essentially completed. <br /> <br />The contractor at Silver Jack Dam, Bostwick Park Project, has <br />resumed work aft.er being shut down since last November. Last fall <br />the damsite area was cleared and stripping operations were nearly <br />completed. <br /> <br />The contract for repairs to the lining of the Gunnison Tunnel <br />on t.he Uncompahgre Project was completed on March 22, 1967. <br /> <br />Transmission Svst.em Operation <br /> <br />The interconnection of power systems of the East and West, <br /> <br />i; <br />
The URL can be used to link to this page
Your browser does not support the video tag.