My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11275
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11275
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:46 PM
Creation date
10/12/2006 4:51:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8441
Description
Colorado Big Thompson Project
State
CO
Basin
South Platte
Water Division
1
Date
4/5/1965
Title
Agenda Item #3 - Board Meeting - April 14 1965
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />C'.) <br />c..., <br />C1 <br />c::: <br />}oo-- <br /> <br />the specified flow of 1,250 cubic feet per second of water at the <br />present site of said Shoshone diversion dam, provided this amount is <br />not supplied from the 52,000 acre-feet heretofore specified. Water <br />not required for the above purposes shall also be available for dis- <br />posal to aqencies for the development of the shale oil or other <br />industries. II (Emphasis supplied). <br /> <br />It is therefore recommended that this Board approve the <br />request of The Oil Shale Corporation and associates, and that the <br />Director of this Board be authorized to indicate such approval in <br />writing to the Director of Region 7, Bureau of Reclamation. <br /> <br />FLS:lk <br />Enclosure <br /> <br />Memo, Agenda Item #3 <br /> <br />-2- <br /> <br />April 5, 1965 <br />
The URL can be used to link to this page
Your browser does not support the video tag.