My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11269
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11269
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:45 PM
Creation date
10/12/2006 4:51:53 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.100
Description
Trinidad Project - Studies - Operation Studies
State
CO
Basin
Arkansas
Water Division
2
Date
1/1/1996
Author
CWCB
Title
Trinidad Background Info Notebook Part 5
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />4Ji80 <br /> <br />All operat i ona 1 criteri a s i mi 1 ar to Run 5H except <br />the maximum joint-use pool is 39,000 acre-feet <br />rather than the previous 19,500 acre-feet. <br />Compares the effect of Trinidad Project operation <br />to that of historical Model reservoir operation. <br /> <br />5R39 <br /> <br />Same as 5H39 except compares the effect of Trinidad <br />PrOject operat ion to that of rehabi 1 itated Model <br />reservoir operation. <br /> <br />1 HNOWBP <br /> <br />All operational criteria similar to Baseline study <br />except that no bypass releases are made from <br /> <br />Trinidad Reservoir to meet Highland and Ninemile <br />Cana 1 demands in wi nter (November-March) months. <br />Compares the effect of Tri n i dad Project oprat i on <br />to that of historical Model reservoir operation. <br /> <br />lRNOWBP <br /> <br />Same as lrlNOWBP except compares the effect of <br />Trinidad Project operation to that of rehabilitated <br />Model reservoir operation. <br /> <br />All operational criteria similar to Run 5H except <br />that no bypass releases are made from Trinidad <br />Reservoir to meet Highland and Ninemile Canal <br />demands in wi nter (November-March) months. <br />Compares the effect of Trinidad Project operation <br />to that of historical Model reservoir operation. <br /> <br />5HNOWBP <br /> <br />5RNOWBP <br /> <br />Same as 5HNOWBP except compares the effect of <br />Trinidad Project operation to that of rehabilitated <br />Model reservoir operation. <br /> <br />1HNOBP <br /> <br />All operational criteria to Baseline study except <br />that no bypass releases are made from Trinidad <br />Reservoir to meet Highland and Ninemile Canal <br />demands in any month. Compares the effect of <br />Trinidad Project operation to that of historical <br />Model reservoir operation. <br /> <br />lRNOBP <br /> <br />Same as lHNOBP except compares <br />Trinidad Project operation to that <br />Model reservoir operation. <br /> <br />the effect of <br />of rehabilitated <br /> <br />5HNOBP <br /> <br />All operational criteria similar to Run 5H except <br />that no bypass releases are made from Trinidad <br />Reservoir to meet Highland and Ninemi1e Canal <br />demands in any month. Compares the effect of <br />Trinidad Project operation to that of historical <br />MOdel reservoir operation. <br /> <br />5RNOBP <br /> <br />Same as 5HNOBP except compares the' effect of <br />Trinidad Project operation to that of rehabi1i- <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.