My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11236
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:39 PM
Creation date
10/12/2006 4:50:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
12/17/1974
Title
Preliminary Engineering report for the Replacement of the Costilla Creek Diversion Structure
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />''''I <br />f<>t <br />"'t <br />g-::J <br /> <br />~..)... <br />i1 <br /> <br />~.'.'.j <br />0.,. <br />t'\,~ <br /> <br />fCl <br />}4 <br />:;l:j <br /> <br />~~ <br />,~_., <br /> <br />;.s~' <br />i:j <br /> <br />~l <br />~~ <br />'.I <br /> <br />~ <br /> <br />t... <br />tn <br />\',.. <br />......, <br />t-,-::", <br />l.._') <br /> <br />3 <br /> <br />PRELIMINARY ENGINEERING REPORT <br />---- ----~---_._~ <br /> <br />FOR THE <br />COST II,LA CR~EK-.lLillRS IOtL?:I:RlJCTUREJ)~OJ E CT <br /> <br />I I NTRODUCTI 011 <br /> <br />--- <br /> <br />The purpose of the following report is to present facts deter- <br /> <br />mined during a preliminary engineering study of the Costilla Creek <br /> <br />diversion structure,and information necessary for consideration by <br /> <br />the engineer retained to do the design work and prepare plans and <br /> <br />specifications for subsequent work. The project is for the reha- <br /> <br />bilitation of the existing structure or construction of a new <br /> <br />structure on Costilla Creek which will divide available water into <br /> <br />Acequia Madre, Cerro Canal and Costilla Creek in accordance with <br /> <br />terms of the Revised Costilla Creek Compact. <br /> <br />The structure is located one mile southeast of the co~nunity <br /> <br />of Costilla, in Taos County, New Mexico. The project map is pre- <br /> <br />sented on Plate I at the end of this report. <br /> <br />The area served consists of agricultural lands located in the <br /> <br />southerly portion of Costilla County, Colorado and the northerly <br /> <br />portion of Taos County, New i1exico. This area comprises approxi- <br /> <br />mately 7807 acres of productive farmland which is included in six <br />
The URL can be used to link to this page
Your browser does not support the video tag.