My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11236
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:39 PM
Creation date
10/12/2006 4:50:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
12/17/1974
Title
Preliminary Engineering report for the Replacement of the Costilla Creek Diversion Structure
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'~>.~. <br />;f.,. <br />~ . <br />l-';' <br /> <br />n <br />i."j <br /> <br />....1 <br />lj <br /> <br />i:~c,l <br />'.A <br />';::' <br /> <br />... <br />,;.;; <br /> <br />>1 <br /> <br />". <br />,;j <br /> <br />;~ <br />i'; <br /> <br />. , <br /> <br />l~ <br /> <br />co <br />to <br /> <br />'-- <br /> <br />..-/ <br />(" ~) <br />t.._" <br /> <br />Leakage from Cerro Canal is minimal in the 2000 feet from the <br /> <br />headgate to the crossing with the Costilla-Amalia highway. However, <br />even the minimal losses become important during periods of low flow. <br /> <br />VII I RECOr~MENDATIONS <br /> <br />It is recommended that: <br /> <br />1. The Costilla Creek diversion structure be constructed at a <br /> <br />location apprOXimately 60 feet downstream from the existing struc- <br /> <br />ture; that there is incorporated in the design of the structure sand <br />slots and waste lines, or other desanding provisions; and that the <br /> <br />design is not dependent on support from solid abutments or founda- <br /> <br />tion. <br /> <br />2. Cerro Canal be lined from the diversion structure downstream <br /> <br />to the highway crossing, a distance of apprOXimately 2000 feet, if <br /> <br />funds are available. This portion of the project should have a pri- <br /> <br />ority junior to that assigned to construction of the diversion struc- <br /> <br />ture. <br /> <br />3. Canal or ditch linings that may be constructed in the future <br /> <br />have provision for sediment basins. <br /> <br />4. A study be conducted in the near future to determine effects <br /> <br />and cost of a small reservoir just upstream of the diversion structure. <br />
The URL can be used to link to this page
Your browser does not support the video tag.