My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11236
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11236
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:39 PM
Creation date
10/12/2006 4:50:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
12/17/1974
Title
Preliminary Engineering report for the Replacement of the Costilla Creek Diversion Structure
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10 <br /> <br />Item <br /> <br />Description <br /> <br />Quantity <br /> <br />Unit <br /> <br />1 <br />2 <br /> <br />6 <br /> <br />Excavation <br /> <br />Sheet piling w/wales <br />& ties <br /> <br />Concrete <br /> <br />Reinforcing steel <br /> <br />120 x 60 radial gate <br />w/hoist & hardware <br /> <br />48 x 60 slide gate <br />w/hoist & hardware <br /> <br />Backfi 11 <br /> <br />Riprap <br /> <br />Removal of existing <br />structure <br /> <br />c .y. <br /> <br />320 <br /> <br />c.y. <br /> <br />1,000 <br />433 <br />58,500 <br /> <br />sq. ft. <br />c.y. <br />1 bs. <br /> <br />3 <br />4 <br />5 <br /> <br />2 <br /> <br />ea. <br /> <br />1 <br />320 <br />100 <br /> <br />ea. <br /> <br />7 <br />8 <br />9 <br /> <br />c.y. <br />c .y. <br /> <br />130 <br /> <br />Construction Total <br /> <br />Administrative, legal, fiscal @ 3% C.T. <br />Engineering @ 10% Construction Total <br />Inspection @ 4% Construction Total <br />Contingencies @ 10% Construction Total <br /> <br />Project Total for Diversion Structure <br /> <br />Concrete lining Cerro <br />Canal incl. dirt work 2,000 <br /> <br />1. f. <br /> <br />Adl1linistrative, legal, fiscal @ 3;; C.T. <br />Engineering @ 8% Construction Total <br />Inspection @ 4% Construction Total <br />Contingencies @ 10% Construction Total <br /> <br />Project Total for Canal Lining <br /> <br />Project Total, Diversion Structure and <br />Canal Lining <br /> <br />"0,-,,., <br /> <br />10 <br /> <br />Unit Cost <br /> <br />Extension <br /> <br />3.00 <br /> <br />960.00 <br /> <br />4.00 <br />215.00 <br />0.60 <br /> <br />4,000.00 <br />93,095.00 <br />35,100.00 <br /> <br />9,250.00 <br /> <br />18,500.00 <br /> <br />3,705.00 <br />2.00 <br />10.00 <br /> <br />3,705.00 <br />640.00 <br />1,000.00 <br /> <br />100.00 <br /> <br />-L~OJlO.OJl <br /> <br />$170,000.00 <br /> <br />5,100.00 <br />17,000.00 <br />6,800.00 <br />17 ,000.00 <br /> <br />$215,900.00 <br /> <br />26.00 <br /> <br />52,000.00 <br /> <br />1,560.00 <br />4,160.00 <br />2,080.00 <br />5,200._00 <br /> <br />$ 65,000.00 <br /> <br />$280,900.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.