My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11214
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:33 PM
Creation date
10/12/2006 4:48:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.776
Description
Uncompahgre River General
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1983
Author
West Slope Hydro Par
Title
Before the United States of America Federal Energy Regulatory Commission - Application for License for Major Project - Uncompahgre Valley Hydroelectric Project Number 2
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />onosg~ <br /> <br />TABLE A-4 <br /> <br />SUMMARY OF SITe DATA <br />UNCOMPAHGRE VALLEY HYDROELECTRIC PROJECT NO.2 <br /> <br />a. Number Qf Generating Units. Auxiliarv Units. Caoacitv <br /> <br />Type: <br /> <br />One double regulated 2250 Qffi horizontal propeller <br />turbine. <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Capacity: Maximum output <br />Rated output <br /> <br />1200 KW <br />1100 KW <br /> <br />Auxiliary <br />Units: <br /> <br />None <br /> <br />Provisions <br />For Future <br />Additions: <br /> <br />None <br /> <br />b . <br /> <br />Descriotion QL Plant One ration <br /> <br />The plant will be operated as a strict run-of-the-river <br /> <br />facility utilizing regulated flows in the irrigation canal. <br /> <br />The plant will be operated automatically from a remote site. <br /> <br />c. <br /> <br />Averaae Annual Production <br /> <br />7.340,000 KWh for the twelve month operation. <br /> <br />d. <br /> <br />Estimated Avera~e ~ <br /> <br />The exact head will vary with the flow conditions in the <br /> <br />canal. <br /> <br />The average head, however, is estimated to be <br /> <br />17.5 feet. <br /> <br />A-J3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.