Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />1\.") <br />en <br />m <br />CD <br /> <br />5. provide follow-up onfarm irrigation water management <br /> <br />assistance, a,ld <br /> <br />6. conduct monitorIng and evaluation actlvities to <br /> <br />determine program effectiveness. <br /> <br />f2':OiS1'ess Report~ <br /> <br />])~~l'ttaent of ti1e Intel'ioi' <br /> <br />~o~orado River Basin Salinity Control Progl'am (Reclamation) <br /> <br />Grand Valley Unit, Colorad2 - Lining of the Government <br />rlignline Canal, replacement of Government ~ignline Laterals, <br /> <br />and tne installation of the hoss and Debris Removal Structure <br /> <br />in th", stage One acea ace essentially comp.J.ete. ilyGrologlc <br /> <br />and fish and wildlife monitoring in the Stage One area are <br /> <br />continuing. <br /> <br />Tne CounClJ. lH\::; COilcei'n over' tlle pr'oblem of <br /> <br />cracking of the concrete lining of the Government Highline <br /> <br />Canal. Keclamatlon is studYln~ the proolem and will make <br /> <br />recommendations for correction on the existIng lined section <br /> <br />and foi' avoidiu,> similar probJ.ems il1 tne Stage THO ai'ea. The <br /> <br />Grand Valley ~ater Users Association, Colorado Division of <br /> <br />L~lldlife, and declamation ace alSO cOtJcel'ned "itn big game <br /> <br />losses in the Stage One poetion of the Government Highline <br /> <br />Canal. In addition, cemovdl of deer and elk f'ro,ll the canal <br /> <br />also poses a significant human safety prOblem. <br /> <br />Design Jilta collectIon IS undel'IJay on t~le dest Bnd <br /> <br />Govel'nment Highline Canal and its laterals, tnis is the first <br /> <br />area that WIll be constructed under Stage r~o. InitIation of <br /> <br />construction is expected in tne summer of 19ti6. <br /> <br />~5. <br /> <br />);-,," <br />