My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11190
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11190
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:29 PM
Creation date
10/12/2006 4:47:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1972
Title
Report of the Rio Grande Compact Commission 1972
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r-- <br /> <br />26 <br /> <br />RIO GRANDE COMPACT COMMISSION REPORT <br /> <br />r... <br />C'".> <br /> <br />RECORDS OF DELIVERIES AND RELEASES <br /> <br />r'- ) <br /> <br />At the annual meeting of the Compact Commission on March 30, 1973, <br />the records of deliveries and releases for calendar year 1972 were <br />examined and the computations of debits and credits based thereon were <br />reviewed. The records and computations as reviewed by the Commission <br />are reproduced on the next three pages. <br /> <br />'- <br /> <br />The delivery of water in the Rio Grande at the Colorado-New Mexicc <br />State line was obtained from record of streamflow near Lobatos, <br />Colorado; the obligation of Colorado to deliver water at the State line <br />was computed as prescribed in Article III. Item C5, the Reduction of <br />Debits prescribed in Article VI, was computed in accordance with the <br />Rules and Regulations. <br /> <br />The delivery of water by New Mexico to Project Storage was <br />computed from the actual streamflow record and the record of operation <br />of Elephant Butte Reservoir; the scheduled delivery was computed as <br />prescribed in the Resolution of the Commission adopted at the Tenth <br />Annual Meeting, and published in this report. Item NM4, Reduction of <br />Debits by Evaporation, was computed in accordance with the Rules and <br />Regulations. Item NM6, Reduction of credits, is in accordance with <br />Article VI, <br /> <br />The actual release from Project Storage during the year was <br />measured at stations below Caballo Dam. The Accrued Departure from <br />Normal Release is an under-release but 1s omitted in accordance with <br />a decision of the Commission at the meeting on February 15, 1968. <br /> <br /> <br />~~ <br />1; '-~ <br />~~:':< ~:-~,;;;}:.~~~ <br />>', -." .,,"'~. <br /> <br />~I <br />
The URL can be used to link to this page
Your browser does not support the video tag.