My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11099
CWCB
>
Water Supply Protection
>
Backfile
>
11000-11999
>
WSP11099
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:16:04 PM
Creation date
10/12/2006 4:42:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.114.E
Description
Dolores Participating Project
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
4/1/1977
Author
USDOI-BOR
Title
Definite Plan Report - Appendix C - Project Lands/Drainage - Dolores Project-Colorado
Water Supply Pro - Doc Type
Definite Plan Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CONTENTS (Continued) <br /> <br />Drainage (Continued) <br /> <br />Chapter I Introduction (continued) <br />General land characteristics <br />Dove Creek area , . . <br />Montezuma Valley area . . <br />Towaoc area . . . . . . . <br />Quality of irrigation water. <br />Summary of drainage conditions <br />Summary of drainage plan and cost estimate <br />Chapter II Investigations...... <br />Investigations program <br />Subsurface exploration <br />Introduction. . . . <br />Deep hole drilling, sampling, and testing <br />Escarpment observations . . . <br />Land classification boring and sampling <br />Compilation and analysis of data. <br />Permeability studies <br />Water table studies. <br />Quality of water . . <br />Topography . . . . . <br />Methods of estimating drainage requirements. <br />Investigations required during irrigation <br />development. <br />Chapter III Dove Creek area <br />Location . . <br />Geology. . . <br />Physiography <br />General configuration <br />Drainageways, . . . . <br />Soils and subsurface materials <br />Stratigraphy, texture, and structure. <br />Unconsolidated materials <br />Bedrock. . . . . . . <br />Permeability. . . . . . <br />Salinity and alkalinity <br />Ground water table . . . . <br />Drainage facilities. . . . <br />Drainability of project lands. <br />Drainage requirements. <br />Canal lining <br />Chapter IV Towaoc area <br />Location . . <br />Geology. . . <br />Physiography <br />General configuration <br />Drainageways. . . . . <br /> <br />vi <br /> <br />Page <br /> <br />5 <br />5 <br />5 <br />6 <br />7 <br />7 <br />9 <br />11 <br />11 <br />11 <br />11 <br />12 <br />12 <br />12 <br />13 <br />13 <br />13 <br />13 <br />14 <br />14 <br /> <br />15 <br />17 <br />17 <br />17 <br />18 <br />18 <br />24 <br />26 <br />26 <br />26 <br />27 <br />27 <br />28 <br />28 <br />29 <br />29 <br />35 <br />35a <br />36 <br />36 <br />36 <br />37 <br />37 <br />37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.