Laserfiche WebLink
<br />Q <br />N <br />~ <br />W <br /> <br />Page 9 <br /> <br />normal operations. During this period, they were asked through their engineering consultants <br />whether or not their operations appeared to be normal. They did not identify any change in their <br />normal operation due to flowing the Redstone well for an extended period of time. <br /> <br />-.,", <br /> <br />Mlchnel J. Galloway <br />Consulllng Hydrogeologlsl <br /> <br />Projecl1016 <br /> <br />4,,' <br />