Laserfiche WebLink
<br />000716 <br /> <br />-3- <br /> <br />III. AFTER THE SOIL MASS HAS FORMED A DAM <br /> <br />Rent large 30 to 50 cubic feet per second pumps. However, no high <br />capacity pumps are available in Colorado. If this option is considered, <br />we should take into account the large amount of electricity power <br />required to run the pumps. (See figure 7 for power requirements). <br /> <br />Pumps are usually available for rent in Texas and Florida. The rental fee is <br />approximately $l,OOO/month/pump. The pumps from Texas could be shipped, be on <br />_the job, and operational in 24 hours. That is if the pumps are available. <br /> <br />;;.< <br /> <br />. / B. <br />~ " <br /> <br />5." . <br /> <br />'..<1:2 I D. <br /> <br />5. - . <br /> <br />j~f-;;,1-I!F. <br /> <br />, <br />> <br /> <br />A. <br /> <br />Construct a <br />ava i lable. <br />in 1983). <br /> <br />tunnel. This option is feasible when competent material is <br />(Such as the tunnel constructed in Utah at the Thistle Slide <br /> <br />However, it is time consuming and expensiye. A good portion of the area <br />upstream of the slide could be inundated before the tunnel is functional. <br /> <br />Blast rock or haul in rock and let the rock form a drainage path for the <br />water to flow through. <br /> <br />This is dangerous. The slide dam could fail along the rock/soil mass face. <br /> <br />C. <br /> <br />Construct a siphon. This is difficult since the slide continues to move. <br /> <br />Experience at the Thistle Slide dam has not been Pos1itive. The siphon pipe <br />was pulled apart as the soil mass continued to move. <br /> <br />E. <br /> <br />Use dynamite to keep the channel open. The use of dynamite is more <br />suited with solid rock. Dynamite does not work too well with soft <br />material as will most likely be encountered in a slide. <br /> <br />Divert water or store water upstream. <br /> <br />At the Vail/Minturn potential slide area, one 5 percent of the drainage area <br />is protected with a dam. Dams should be considered but will probably not be a <br />major consideration in most potential slide areas. <br /> <br />G. Release water from storage to help flush out the slide material. <br /> <br />H. A combination of the above. <br /> <br />LHD:pka/5216H <br />