Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~ <br />en <br />~ <br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />water development projects be completed before control measures are <br /> <br />identified or brought on line, temporary increases above the criteria <br /> <br />could result and these increases will be in conformance with the <br /> <br />regulation. With completion of control projects, those now in the <br /> <br /> <br />plan or those to be added subsequently, salinity would return to <br /> <br />or below the criteria level. <br /> <br />Periodic increases above the criteria as a result of reservoir <br /> <br />conditions or periods of below long-time average annual river flow <br /> <br /> <br />also will be in conformance with the regulation. With satisfactory <br /> <br />reservoir conditions and when river flows return to the long-time <br /> <br />average annual flow or above, concentrations are expected to be <br /> <br />at or below the criteria level. <br /> <br />-iii- <br />