My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP11022
CWCB
>
Water Supply Protection
>
Backfile
>
10001-10999
>
WSP11022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 3:15:42 PM
Creation date
10/12/2006 4:39:55 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.911
Description
Miscellaneous Small Projects and Project Studies - SE Needs Assessment and PSOP
State
CO
Basin
Arkansas
Water Division
2
Date
12/10/1998
Author
GEI Consultants Inc
Title
SECWCD Arkansas Basin Future Water and Storage Needs Assessment
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />O~~e}. and Storage Needs Assessment <br />SECWCD/Assessment Enterprise <br />December 10, 1998 <br /> <br />Arkansas River to Pueblo Reservoir during the preceding months of October, <br />November, December, January, February, March, and April. <br /> <br />2. All west slope water available is diverted to the Project to the east slope, subject <br />to the Operating Principles, limits of reservoir storage capacity, contractual <br />arrangements, and demand for direct delivery of Project water. <br /> <br />3. As much of the newly diverted west slope Project water as possible is stored in <br />the upper reservoirs, subject to the limits of reservoir storage capacity and <br />contractual arrangements. <br /> <br />4. Newly diverted west slope Project water, which cannot be stored in the upper <br />reservoirs, is conveyed down the Arkansas River to Pueblo Reservoir, subject to <br />the limits ofreservoir storage capacity and contractual arrangements. <br /> <br />5. Project water is released from the upper reservoirs to meet the demands of Project <br />water users who are located in the District upstream of Pueblo Reservoir. These <br />releases may occur in any month throughout the year. <br /> <br />6. Project water is released from Pueblo Reservoir to the Arkansas River, the <br />Fountain Valley Conduit, and the Bessemer Ditch to meet the demands of Project <br />water users that may be served from Pueblo Reservoir. Releases to the Arkansas <br />River and Fountain Valley Conduit may occur in any month throughout the year. <br />Releases to the Bessemer Ditch are during the irrigation season. <br /> <br />The conveyance of water from the upper reservoirs to Pueblo Reservoir is managed to try to <br />meet a variety of in stream flow objectives within the overall legal constraints of water law and <br />contractual requirements and in accordance with the voluntary annual flow agreement between <br />the Bureau of Reclamation and Colorado Department of Natural Resources. These objectives <br />include: <br /> <br />. Maintaining a minimum year-round flow of250 cfs (at the Wellsville Gage) to <br />protect the fishery. <br /> <br />. Maintaining optimum flows for fish spawning during specific periods of the year. <br />This set of flows is relatively complex, involving target flows during fish <br />spawning, incubation, and hatching periods. <br /> <br />rn GEl Consultants, Inc. <br /> <br />2-4 <br /> <br />Q7411\FiniU\TEXT-A.WPD <br /> <br />I <br />I <br />I <br />I <br />, <br />II <br />I <br />I <br />I <br />" <br /> <br />I <br />I, <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />\1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.