Laserfiche WebLink
<br /> <br />,," . I <br /> <br /><.) <br /> <br />~... <br />t.?" <br />....1 <br />Q <br /> <br /> <br />Coachella Canal lining <br />Bypass Drain <br />A&E Contract - Design of desalter <br />Irrigation efficiency improvement <br /> <br />$1.0 million <br />$9.235 million <br />$5.5 million <br />$1.15 million <br /> <br />Remainder for other preconstruction activities and siphon <br />construction <br /> <br />The Colorado River Basin Salinity Control Act provides an excellent <br />basis for initiating salinity control measures in the basin. The <br />provisions of this Act will now be integrated with a total basin <br />water management plan. Such a plan would provide for the most <br />efficient use of the water of the basin by: <br /> <br />1. Integrating water resource management and land use planning <br /> <br />2. Planning and controlling of interrelated structures and <br />physical features <br /> <br />3. Examining and evaluating the existing systems, institutions, <br />and legal requirements <br /> <br />4. Displaying alternative plans to examine quality and quantity <br />impacts within a river basin, and <br /> <br />5. Deriving efficient operational and management modes for the <br />river system. <br /> <br />14 <br />