Laserfiche WebLink
<br /> <br />....... <br />, . <br /> <br />. <br />II <br />. <br />. <br /> <br /> <br />TABLE OF CONTENTS (Continued) <br /> <br /> <br />Page <br /> <br />9.2.2 Regional Market Area <br />9.2.3 Summary of'Power Demand Projections <br />9.3 MARKET VALUE OF POWER <br />9.3.1 Current Market Prices <br />9.3.2 Avoided Costs <br />9.3.2.1 Public Service of Colorado (PSC) <br />9.3.2.2 Earlier Study of Hydropower in the <br />Basin <br />9.3.2.3 Combined Cycle Facility in the Midwest <br />9.3.3 Summary of Market Value of Power <br />9.4 A PROPOSED HYDROGENERATION PROJECT <br />9.4.1 Background and Overview <br />9.4.2 Preliminary Project Studies <br /> <br />9-11 <br />9-13 <br />9-16 <br />9-16 <br />9-18 <br />9-19 <br /> <br />9-21 <br />9-22 <br />9-22 <br />9-24 <br />9-24 <br />9-25 <br /> <br />10.0 NON-STRUCTURAL PLAN ELEMENTS 10-1 <br />10.1 GENERAL 10-1 <br />10.2 IDENTIFICATION AND INITIAL SCREENING 10-2 <br />10.2.1 Identification of Plan Elements 10-2 <br />10.2.2 Screening of Plan Elements 10~2 <br />10.3 DESCRIPTION OF NON-STRUCTURAL PLAN ELEMENTS 10-8 <br />10.3.1 Water Supply Management Elements 10-8 <br />10.3.1.1 Phreatophyte Control 10-8 <br />10.3.1~2 Ditch Lining 10-9 <br />10.3.1.3 Conjunctive Use of Ground Water and <br />Surface Water 10-11 <br />10.3.1.4 Dredge Existing Reservoirs 10-17 <br />10.3.1.5 Hydrologic Instrumentation 10-19 <br />10.3.1.6 Reuse of Municipal Wastewater 10-20 <br />10.3.1.7 Transfer of Storage Decrees 10-20 <br />10.3.1.8 Transfer of Points of Diversion 10-22 <br /> <br />-9- <br />